• 热门标签

当前位置: 主页 > 航空资料 > 国外资料 >

时间:2010-09-07 00:45来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

q. Training Yes No
r. Statistical Process Control Yes No
12. Does a written procedure exist for contract review? Yes No
13. Does quality assurance review contract requirements? Yes No
14. Does the system ensure that all contract requirements are clearly understood prior to the
commencement of work? Yes No
15. Are records of contract review maintained? Yes No
16. Does a written procedure exist to control all elements and data related to the quality system?
Yes No
17. Are documents reviewed and controlled by authorized personnel? Yes No
18. Are documents available to personnel? Yes No
19. Are obsolete documents removed or marked in such a way so as to prevent further use?
Yes No
20. Does a written procedure exist for writing and review of purchase orders?
Yes No
21. Do purchase orders contain all the necessary product information, including specifications?
Yes No
22. Are purchasing documents reviewed prior to release? Yes No
23. Is an approved supplier list maintained? Yes No
24. Is there a system for evaluating the performance of suppliers? Yes No
25. Is there a system in place to ensure that incoming products conform to the requirements of the
purchase order? Yes No
3 of 7
Self Evaluation Questionnaire
26. Do the storage areas provide:
a. adequate space and appropriate racks to prevent damage or mishandling?
Yes No
b. adequate security from unauthorized access? Yes No
c. segregation of aircraft from non-aircraft hardware? Yes No
d. segregation of serviceable from non-serviceable parts? Yes No
27. Do procedures exist for the control, verification, and storage of customer supplied products?
Yes No
28. If a customer supplied product is damaged or lost, is the customer notified?
Yes No
29. Do you maintain a system for taking corrective action to prevent repeat mistakes and/or
errors? Yes No
30. Is the corrective action system in place to ensure prompt action and response?
Yes No
31. Are non-conformance reports regularly prepared for and reviewed by management?
Yes No
32. Do procedures exist to ensure that identification of product is maintained throughout all
stages of processing? Yes No
33. When traceability is required by contract, does the product contain a unique identifier?
Yes No
34. If traceability of product is lost, is the product processed as nonconforming?
Yes No
35. Do procedures exist for the control of parts throughout processing?
Yes No
36. Does the supplier maintain a suitable working environment to maintain product quality?
Yes No
37. Is suitable equipment provided and maintained to ensure product quality?
Yes No
38. Are parts accompanied with the correct documentation throughout processing, indicating the
current operation sequence and acceptance criteria? Yes No
4 of 7
Self Evaluation Questionnaire
39. When special processing requires customer approval, do procedures exist to ensure that parts
are processed according to the requirements of the customer? Yes No
40. Do procedures exist to cover incoming, in process and final inspections?
Yes No
41. Is incoming product verified prior to release for processing? Yes No
42. Is in process inspection carried out at designated operation and completed prior to further
processing? Yes No
43. Does final inspection confirm that all the requirements are met? Yes No
44. Does the following occur prior to shipping:
a. A check for any obvious physical damage? Yes No
b. Verification of part numbers, including dashes and letters, model numbers, serial
numbers, etc. to ensure items being shipped match the accompanying
documentation? Yes No
c. Verification of packing slips to ensure it contains all the information required by the
customer? Yes No
d. Verification that shipping containers and the packaging used are appropriate for the
items being shipped? Yes No
e. Verification that all appropriate documentation (maintenance release, material
certification, traceability documents, etc.) are at hand, properly completed and
signed? Yes No
45. If sampling inspection is preformed, is it to an approval plan? Yes No
46. Do procedures exist for the control of I.M.T.E.? Yes No
47. Does the processor maintain, as a minimum, a calibration system in accordance with
MIL-STD-45662, ISO 10012, or equivalent? Yes No
48. Does the processor maintain working standards of required accuracy that are periodically
calibrated to primary standards traceable to N.I.S.T.? Yes No
49. Does the procedure state the frequency of re-calibration of all inspection tooling, including
employee owned tools? Yes No
50. Are all measuring devices uniquely identified to allow calibration record traceability?
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:航空资料39(69)