曝光台 注意防骗
网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
4 0
5 amp
6 25–42
7 metres
8 16,000
9 seconds
10 0.015
4 Complete the sentences
1 pass through this hole
2 instead of deflating
3 because of bad weather
4 the wrong way up
5 damage to the wall
6 take out these plugs/take these plugs out
7 take off the cover/take the cover off
8 switch to the ‘run’ position
9 circuit in the selector
10 fill in the maintenance form/fill the
maintenance form in
5 Complete the sentences
1 should
2 must
3 must not
4 should not
5 can
6 may
7 should
8 might
9 must
10 must
6 True or false
1 True 6 True
2 True 7 True
3 False 8 False
4 True 9 True
5 False 10 True
Take-off Tests Answer key 12
Answer key
1 Complete the sentences
1 to; of
2 with
3 on
4 to; of
5 of
6 from
7 across
8 on
2 Complete the table
1 extend
2 fitting
3 expand
4 replacement
5 adjustment
6 location
7 attachment
8 indicate
9 fastener
10 inspect
3 Complete the sentences
1 both
2 each other
3 other
4 both
5 other
6 each other
7 another
8 each other
9 both
10 another
4 Complete the sentences
1 supplies; compass
2 inverter; pole
3 electronic; flight
4 static; distance
5 measures; flows
5 Complete the table
1 cut
2 broke
3 found
4 put
5 taken
6 fly
7 blew
8 caught
9 kept
10 became
6 Add the missing words
flow chart (4); steps (7); path (10); follow (5);
results (9); perform (3); following (1);
system (8); remove (6); necessary (2)
Self Evaluation Questionnaire
General Company Information:
Plasma Coating Corp.
13309 S. Western Ave.
Gardena, CA 90248
Phone: (310) 532-3064
Fax: (310) 532-0429
Website: www.plasmacoatingcorp.com
FAA Repair Station #: PC6R0810J
Year Business Established: 1972
Type of Business: Job shop metal finishing of aerospace detail parts.
(See website for complete list of processes performed.)
Key Personnel: Name Title E-Mail
Jim Emery President jemery@plasmacoatingcorp.com
Derek Needham General Manager dneedham@plasmacoatingcorp.com
Robert Jones Quality Assurance Manager rjones@plasmacoatingcorp.com
Type of Building(s): Brick
Area (sq. ft.)/Number of Buildings: Approximately 19,000 sq. ft. with 2 buildings.
Number of Shifts: 2
Number of Employees: Total: 27 Quality Assurance: 4 (Inspection/Lab: 3 Planning: 1)
Major Customers: Airbus
Boeing
General Electric
Goodrich Aerostructures
Goodrich Landing Gear
H.R. Textron
Lockeed
Messier-Dowty
Parker
Pratt & Whitney
Sargent Controls
Sonic Industries
Government Inspection Available:
Itinerant Resident
1. Is your company agreeable to an on-site survey, to confirm or elaborate on this survey?
Yes No
2. Is your company receptive to source inspection? Yes No
1 of 7
Self Evaluation Questionnaire
3. Is your company subject to government source inspection? Yes No
4. Does the company have a quality manual? Yes No
5. Is the manual reviewed periodically? Yes No
6. Can your company send a copy of your quality manual if requested?
Yes No
7. From what standard is your company’s quality system derived? AS7004 (NADCAP),
AS9000, FAA Part 145, CASE 1A
8. Are the responsibility, authority, and interrelation of personnel defined, particularly those
affecting quality? Yes No
9. Is there a delegated management representative responsible for the quality system?
Yes No
10. Does management periodically review the quality system to ensure continuing suitability and
effectiveness? Yes No
11. Does the quality system cover the following elements:
a. Management Responsibility Yes No
b. Quality System Yes No
c. Contract Review Yes No
d. Document and Data Control Yes No
e. Purchasing Yes No
f. Control of Customer Supplied Products Yes No
g. Product Identification and Traceability Yes No
h. Process Control Yes No
i. Inspection and Testing Yes No
j. Control of Non-Conforming Products Yes No
k. Inspection and Test Status Yes No
l. Control of Inspection, Measuring and Testing Equipment Yes No
2 of 7
Self Evaluation Questionnaire
m. Corrective and Preventive Action Yes No
n. Handling, Storage, Packing, Preservation, and Delivery Yes No
o. Control of Quality Records Yes No
p. Internal Quality Records Yes No