曝光台 注意防骗
网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
Estimated Primary Jobs: 4,500 to 5000
O:\09_PM\02_Prt_Akqui\Flughafen\Flughafen_05-04-english_Vers04.ppt
(Bond Rent)
$
Sublease
MSA OPERATINGCO
Project Revenues
McCarran International
Airport
$
(OR)
(Repayment)
Lease
.
MSA MSA Properties Co. $
BONDHOLDERS
BONDTRUSTEE
OTHER
LENDERS
McCarran Airport, Las Vegas
Project development "East Lot"
1999
Jan Feb March April May June July Aug Sept Oct Nov Dec
2000
Jan Feb March April May June July Aug Sept Oct Nov Dec
2001
Jan Feb March April May June July Aug Sept Oct Nov Dec
Master Lease Phase
Due Diligence
Design Phase
Construction Phase
Master
Lease Phase
Due Diligence
Design Phase
Construction
Phase
Operations
Operations Commence
2002
Jan Feb March April May June July Aug Sept Oct Nov Dec
O:\09_PM\02_Prt_Akqui\Flughafen\Flughafen_05-04-english_Vers04.ppt
The Brussels airport has been extended by a
new terminal. agiplan supported as follows:
Analysis of marketing and tenants mix
Cost structure and weak points analysis
Proposals for the usage of old airport areas
Check of the annual PAX estimates
Consulting of the airport extension
concepts
Preparation and organisation of the
relocations and transfers
Consulting and coordination concerning
the necessary adjustments to meet the
"Schengen" requirements
Consulting and coordination introducing the
100% baggage control in context with the
ICAO-IATA recommendations
Brussels Airport Terminal Company (BATC), Brussels
Project management for airport extension and Start-up
O:\09_PM\02_Prt_Akqui\Flughafen\Flughafen_05-04-english_Vers04.ppt
Franz Josef Strauß (FJS) airport, Munich
ORAT
(Operational Readiness And Transfer)
Planning the Start-Up at FJS-airport
Test & trials runs of all equipment and
systems
Transfer and relocation from Munich
Riem to Munich FJS
O:\09_PM\02_Prt_Akqui\Flughafen\Flughafen_05-04-english_Vers04.ppt
Project management services from 1987 -
1994:
Generating of the organisational unit
(master plan, multi-project structure,
introduction of the data-based project
management system)
Over all project management for time
schedules
Planning the start-up and operational
readiness for Terminal 2 and the
integration in the existing airport
Concept of an information and databased
system concerning the cleaning
of the airport
General coordinator for the reconstruction
of Terminal 1
Planning and site management for
Lufthansa Service GmbH
Fraport AG Frankfurt/Main
Airport extension and Start-up (ORAT)
O:\09_PM\02_Prt_Akqui\Flughafen\Flughafen_05-04-english_Vers04.ppt
For the new air cargo center at the Düsseldorf
international airport agiplan provided a holistic
planning and construction supervision
(1991 - 1994).
Performance of agiplan/aIB:
Concept of the new cargo facilities
Planning of the logistic systems and the
flow of materials
Architecture and general planning of civil
works
Monitoring of execution
34.000 m² gross floor space
Düsseldorf Airport
DUS-Air-Cargo Center
O:\09_PM\02_Prt_Akqui\Flughafen\Flughafen_05-04-english_Vers04.ppt
Development of an overall master plan for the
factory site of AIRBUS industries in Bremen
(450.000 m²).
Performance of agiplan/aIB:
Basic evaluation
Concept for growth scenarios and plant
structure allowing for the functional
specification
Urbanistic concept
Integration of the production hall of the
A400M
Cost estimate
Visualisation
AIRBUS Industries
Development of an overall master plan, Bremen
2003 2008
2015
O:\09_PM\02_Prt_Akqui\Flughafen\Flughafen_05-04-english_Vers04.ppt
The Hamburg airport is planning various
extensions since 1998. This has been e.g. an
apron extension, a satellite building and a new
PAX-terminal.
For the definition of the data of the basic design,
agiplan supported as follows:
Actual situation analysis of PAX & baggage
processes at the airborne and portside
interfaces
Calculation of airport capacities in respect
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:
航空资料24(132)