• 热门标签

当前位置: 主页 > 航空资料 > 国外资料 >

时间:2010-08-20 12:03来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

Steering Committee
Operator
Planner Proj. Supplier /
vendor
Owner
Project manager / coordinator
Subproj. 1 Subproj. 2 Subproj. 3
H & S Proj. Manager
Controlling Procurement
Object 1 Object 2
CCoommmmuunnicicaatitoionn
DDooccuummeenntatatitoionn
Owner / Operator
O:\09_PM\02_Prt_Akqui\Flughafen\Flughafen_05-04-english_Vers04.ppt
Merkmale:
Verbindungen von jedem CCI zur Stufe 3
Reisegepäckkontrolle
Verbindungen von Stufe 3 Reisegepäckkontrolle
zu allen Racetracks
Fallback – Strecken für alle Relationen
(funktionale Redundanz)
Keine Vermischung von clean &
unclean Gepäckstücken auf einer Strecke
Sorter
Sortierrundläufe
Verbindungen von jedem Counter Check-
In (CCI) zu allen Racetracks
racetracks
sorter
Features:
-
-
-
-
Connections from all Counter Check-
In‘s (CCI) to all racetracks
Connections from all CCI to
level 3 baggage inspection
Connections from level 3 baggage -
inspection to all racetracks
Fallback – functionality for all relations
(functional redundancy)
No mix up of clean & unclean baggage
on one track
Baggage systems: planning, realisation, start-up
racetracks
O:\09_PM\02_Prt_Akqui\Flughafen\Flughafen_05-04-english_Vers04.ppt
Baggage system: integrated safety features
CCI
unclean baggage explosive
and multi alarm
level 2A
unclean baggage
level 1
unclean baggage
level 3A
unclean baggage
transfer baggage
level 3B
NAKO
unclean baggage
unclean baggage
unclean baggage
Police action
and additional
measures
LFG, FHG
unclean
baggage
(PAX did
not arrive)
apron
Baggage-PAX
Matching
unclean baggage
dark alarm
unclean baggage
level 1
level 2B
Terminal
g a t e
Sorted clean baggage
apron
Sorter
clean baggage
clean baggage
clean baggage
clean baggage
plane
subject to
police action
unclean
baggage
Sorted clean baggage
clean baggage
clean baggage
clean baggage
O:\09_PM\02_Prt_Akqui\Flughafen\Flughafen_05-04-english_Vers04.ppt
􀂄 Manufacturing the new aircraft A380 in the plant in Hamburg requires an intelligent
concept for waste disposal as the area for traffic and buildings is limited and the
volume of traffic is very high.
􀂄 An investigation of material handling disclosed potential to avoid and diminish
waste.
􀂄 A waste disposal concept describes the process chain from the waste sources
over collecting, separating and condensing up to the final disposal.
􀂄 An optimum had to found between the available capacities for waste depots and
the transport frequencies
Industrial plant structure and factory master planning at airports
e.g.: Waste disposal concept- avoid, diminish, recycle, dispose
O:\09_PM\02_Prt_Akqui\Flughafen\Flughafen_05-04-english_Vers04.ppt
Special airport related fields of expertise
Simulation - Elements of Model
Simulation Model
PAX Baggage Apron
Elements of Model
• Pax
• Baggage
• Apron
Topologie
• Layout
• CAD
• ...
Generator of Flight Plan
• Passenger Flow
• Flight- / Aircraft
Characteristic
• Limitations (Runway Length)
• ...
Characteristics PAX
• Arrival Characteristics
• Commercial
Characteristics
• ...
Transfer-
Relations
Disposition of Resources
• Check-In Counter
• Gate Assignment
• Disposition of Aircraft
Position
• ….
O:\09_PM\02_Prt_Akqui\Flughafen\Flughafen_05-04-english_Vers04.ppt
Special airport related fields of expertise
Simulation - Animation of Simulation Model
Animation of dynamic baggage,- trafficund
passenger flows
Visualisation of the simulation results
Transparency of future operational
procedures
Recognition of (temporary) bottlenecks
Development of measures to optimise
the system planning
Individual
Passenger
Control
PAX-Control at
Metal Detector
Gate
X-Ray Screening of
Luggage
Duty-Free
Waiting
Room
O:\09_PM\02_Prt_Akqui\Flughafen\Flughafen_05-04-english_Vers04.ppt
Terminal Start-up (ORAT) –
Transformation of components in a
"ready for operation" terminal
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:航空资料24(129)