曝光台 注意防骗
网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
unusable and included in ZFW
and C.G. calculations, and
b) ACT transfer valve is secured
closed.
C 1 0 (O) May be inoperative provided:
a) Manual transfer from ACT(s) to
center tank is checked before
each flight, and
b) ACT(s) and center tank fuel
quantity indications on ECAM
FUEL page are operative.
|
||
28-02 Transfer Valve
Additional Center
Tank(s)
C 1 0 May be inoperative in closed position
provided there is no fuel in any ACT.
C 1 0 (M)(O) May be inoperative in closed
position provided:
a) Fuel in any ACT is considered
unusable and included in ZFW
and C.G. calculations, and
b) ACT transfer valve is secured
closed.
(Continued)
U.S. DEPARTMENT OF TRANSPORTATION
MASTER MINIMUM EQUIPMENT LIST
FEDERAL AVIATION ADMINISTRATION
AIRCRAFT:
A-318, A-319, A-320, A-321
REVISION NO:21
DATE: 06/17/2009
PAGE:
28-13
2. NUMBER INSTALLED
3. NUMBER REQUIRED FOR DISPATCH
SYSTEM, &
SEQUENCE ITEM
NUMBERS
1.
4. REMARKS AND EXCEPTIONS
28 FUEL
28-02 Transfer Valve
Additional Center
Tank(s) (Continued)
C 1 0 (M) May be inoperative in open position
provided an alternate procedure is used
for refueling ACT(s).
28-03 Transfer Pump
Additional Center
Tank(s)
C 1 0
28-04 Air Shutoff Valve
Additional Center
Tank(s)
C 1 0 May be inoperative closed provided
there is no fuel in any ACT.
C 1 0 (M)(O) May be inoperative closed
provided:
a) Fuel in any ACT is considered
unusable and included in ZFW
and C.G. calculations, and
b) ACT transfer valve is secured
closed.
C 1 0 (O) May be inoperative closed provided:
a) Manual transfer from ACT(s) to
center tank is verified to operate
normally, and
b) ACT(s) and center tank fuel
quantity indications on ECAM
FUEL page are operative.
|
28-05 Inward Pressure Relief
Valve Additional Center
Tank(s)
C - 0 May be inoperative open provided there
is no fuel in any ACT.
28-06 Vent Valve Additional
Center Tank(s)
C - 0 May be inoperative provided there is no
fuel in any ACT.
(Continued)
U.S. DEPARTMENT OF TRANSPORTATION
MASTER MINIMUM EQUIPMENT LIST
FEDERAL AVIATION ADMINISTRATION
AIRCRAFT:
A-318, A-319, A-320, A-321
REVISION NO:21
DATE: 06/17/2009
PAGE:
28-14
2. NUMBER INSTALLED
3. NUMBER REQUIRED FOR DISPATCH
SYSTEM, &
SEQUENCE ITEM
NUMBERS
1.
4. REMARKS AND EXCEPTIONS
28 FUEL
28-06 Vent Valve Additional
Center Tank(s)
(Continued)
C - 0 (M)(O) May be inoperative provided:
a) Fuel in any ACT is considered
unusable and included in ZFW
and C.G. calculations, and
b) ACT transfer valve is secured
closed.
C - 0 (M)(O) May be inoperative provided:
a) Manual transfer from ACT(s) to
center tank is verified to operate
normally,
b) ACT(s) and center tank fuel
quantity indications on ECAM
FUEL page are operative, and
c) Associated ACT vent valve is
secured open.
28-07 Refuel Valve Additional
Center Tank(s)
C 1 0 May be inoperative in the closed
position.
NOTE: ACT(s) cannot be refueled.
C 1 0 May be inoperative in open position.
28-08 Inlet Valve Additional
Center Tank(s)
1) ACT 1 C 1 0 ACT 1 inlet valve may be inoperative in
closed position provided there is no fuel
in any ACT.
|
C 1 0 (M)(O) ACT 1 inlet valve may be
inoperative in closed position provided:
a) Fuel in any ACT is considered
unusable and included in ZFW
and C.G. calculations, and
b) ACT transfer valve is secured
closed.
(Continued)
U.S. DEPARTMENT OF TRANSPORTATION
MASTER MINIMUM EQUIPMENT LIST
FEDERAL AVIATION ADMINISTRATION
AIRCRAFT:
A-318, A-319, A-320, A-321
REVISION NO:21
DATE: 06/17/2009
PAGE:
28-15
2. NUMBER INSTALLED
3. NUMBER REQUIRED FOR DISPATCH
SYSTEM, &
SEQUENCE ITEM
NUMBERS
1.
4. REMARKS AND EXCEPTIONS
28 FUEL
28-08 Inlet Valve Additional
Center Tank(s)
(Continued)
1) ACT 1 (Continued) C 1 0 (M) ACT 1 inlet valve may be inoperative
in open position provided:
a) ACT 2 is not installed or is
empty, and
b) Transfer valve is verified
operative prior to each flight
when ACT 1 is used.
2) ACT 2 C 1 0 ACT 2 inlet valve may be inoperative in
closed position provided there is no fuel
in ACT 2.
C 1 0 (M)(O) ACT 2 inlet valve may be
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:
航空资料23(15)