• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2010-06-29 14:00来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

2. Preparation .................................................................................................................5
3. Engine Ground Test ...................................................................................................6
4. Maintenance Checklist Zones ....................................................................................7
5. Maintenance Report .................................................................................................39
6. Check Flight Report..................................................................................................41
7. Engine Ground Test Record.....................................................................................42
CHAPTER 05-30 FLIGHTLINE CHECKS.................................................................................................1
1. General.......................................................................................................................1
2. Flight-Line Checks......................................................................................................1
3. Post-Flight Check .......................................................................................................1
Time Limits and
Maintenance Checks
DA20-C1 AMM
Page 2
19 Dec 1997 05-CONTENTS Doc # DA201-C1
Rev. 0
CHAPTER 05-50 UNSCHEDULED MAINTENANCE CHECKS .............................................................. 1
1. General ...................................................................................................................... 1
2. Hard Landing Check.................................................................................................. 1
3. Propeller Strike .......................................................................................................... 4
4. Engine Fire ................................................................................................................ 4
Time Limits and
Maintenance Checks
DA20-C1 AMM
Page 1
30 Apr 2008 05-00-00 Doc # DA201-C1
Rev. 13
CHAPTER 05-00
TIME LIMITS AND MAINTENANCE CHECKS
1. General
This chapter will help you to do the maintenance of the DA20-C1 correctly. All of the usual tasks
are easy to do and no special tools are necessary. Refer to chapters' 04-00 and 05-00 to help you
when you do maintenance and inspections.
Do the scheduled maintenance checks given in this chapter at the recommended times. These
checks are the minimum required to keep the airplane in a good technical condition.
These checks do not over-ride the requirements of the airworthiness authority of the country where
the airplane is registered. You must make sure that all Airworthiness Directives, Service Bulletins
and any other requirements of the airworthiness authority are completed as required.
The airplane manufacturer can change the time between checks. If this happens, the airplane
manufacturer will publish the change as a revision to the Maintenance Manual.
You can decrease the time between scheduled maintenance checks if the airplane’s operation
makes it necessary. You must not extend the time between scheduled maintenance checks without
the airworthiness authority’s approval.
2. Chapter Configuration
A. Section 05-10
Section 05-10 contains the time limits for maintenance checks. It also contains the time between
overhaul for components. Use the data in section 05-10 to find when to do the maintenance.
B. Section 05-20
Section 05-20 contains the maintenance checks schedule for 50, 100, 200, 100 and 6000 hour
checks. It also contains data for the annual check if necessary for national regulations. And it
contains data for a special 25 hour check on new airplanes.
C. Section 05-30
Section 05-30 contains data for Flight Line checks.
D. Section 05-50
Section 05-50 contains the unscheduled maintenance checks. Do these checks after hard
landings and propeller damage.
Time Limits and
Maintenance Checks
DA20-C1 AMM
Page 2
30 Oct 2008 05-00-00 Doc # DA201-C1
Rev. 14
3. Words With Special Meanings
In this maintenance manual, the words that follow have special meanings:
Adjust. To put to a specified position or condition. For example, adjust the clearance
to 1 mm.
Check. A technical name for a group of maintenance tasks. For example, the 100
hour check.
Examine. To look carefully at an item. It includes steps such as these:
− Make sure that the item:
Is complete.
Is correctly attached.
Has no loose parts.
Shows no signs of leaks.
Is not cracked or damaged.
Is not worn.
− Make sure that:
The surface protection is not damaged.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:钻石20系列AMM 1(19)