This chapter discusses safety risk management in the aviation community, looking at it as preemptive, rather than reactive. The principles of risk management and the tools for teaching risk management in the flight training environment are addressed in Chapter 8, Techniques of Flight Instruction.
Defining Risk Management
Risk is defined as the probability and possible severity of accident or loss from exposure to various hazards, including injury to people and loss of resources. [Figure 9-1] All Federal Aviation Administration (FAA) operations in the United States involve risk and require decisions that include risk assessment and risk management. Risk management, a formalized way of thinking about these topics, is the logical process of weighing the potential costs of risks against the possible benefits of allowing those risks to stand uncontrolled. Risk management is a decision-making process designed to
9-3
identify hazards systematically, assess the degree of risk, and determine the best course of action. Key terms are:
• Hazard—a present condition, event, object, or circumstance that could lead to or contribute to an unplanned or undesired event, such as an accident. It is a source of danger. For example, a nick in the propeller represents a hazard.
• Risk—the future impact of a hazard that is not controlled or eliminated. It is the possibility of loss or injury. The level of risk is measured by the number of people or resources affected (exposure); the extent of possible loss (severity); and likelihood of loss (probability).
• Safety—freedom from those conditions that can cause death, injury, occupational illness, or damage to or loss of equipment or property, or damage to the environment. Note that absolute safety is not possible because complete freedom from all hazardous conditions is not possible. Therefore, safety is a relative term that implies a level of risk that is both perceived and accepted.Principles of Risk ManagementAccept No Unnecessary Risk
Unnecessary risk is that which carries no commensurate return in terms of benefits or opportunities. Everything involves risk. The most logical choices for accomplishing an operation are those that meet all requirements with the minimum acceptable risk. The corollary to this axiom is “accept necessary risk” required to complete the operation or task successfully. Flying is impossible without risk, but unnecessary risk comes without a corresponding return. If flying a new airplane for the first time, a CFI might determine that the risk of making that flight in low instrument flight rules (IFR) conditions is unnecessary.Make Risk Decisions at the Appropriate Level
Anyone can make a risk decision. However, the appropriate decision-maker is the person who can develop and implement risk controls. The decision-maker must be authorized to accept levels of risk typical of the planned operation. In a single-pilot situation, the pilot makes the decision to accept certain levels of risk. In the maintenance facility, an aviation maintenance technician (AMT) may need to elevate decisions to the next level in the chain of management upon determining that those controls available to him or her will not reduce residual risk to an acceptable level.Accept Risk When Benefits Outweigh the Costs
All identified benefits should be compared against all identified costs. Even high-risk endeavors may be undertaken when there is clear knowledge that the sum of the benefits exceeds the sum of the costs. For example, in any flying activity, it is necessary to accept some degree of risk. A day with good weather, for example, is a much better time to fly an unfamiliar airplane for the first time than a day with low instrument flight rules (IFR) conditions.Integrate Risk Management Into Planning at All Levels
Risks are more easily assessed and managed in the planning stages of an operation. The later changes are made in the process of planning and executing an operation, the more expensive and time consuming they become. Because risk is an unavoidable part of every flight, safety requires the use of appropriate and effective risk management not just in the preflight planning stage, but in all stages of the flight.Risk Management Process
Risk management is a simple process which identifies operational hazards and takes reasonable measures to reduce risk to personnel, equipment, and the mission.Step 1: Identify the Hazard
A hazard is defined as any real or potential condition that can cause degradation, injury, illness, death, or damage to or loss of equipment or property. Experience, common sense, and specific analytical tools help identify risks.Step 2: Assess the Risk
The assessment step is the application of quantitative and qualitative measures to determine the level of risk associated with specific hazards. This process defines the probability and severity of an accident that could result from the hazards based upon the exposure of humans or assets to the hazards.Step 3: Analyze Risk Control Measures