• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-11-19 23:31来源:蓝天飞行翻译 作者:航空

To view this page ensure that Adobe Flash Player version 9.0.124 or greater is installed.

曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

.  Installation of Actuation Ring Connecting Links on Titanium or Steel Cases

.  Installation of Right-side VSV Actuation Assembly

.  Rig VSV System

.  Installation of Outside Piping and Brackets

.  Installation of Core Engine Items

 

 


.  Preliminary Inspection

.  Installation of VSV Feedback Cable

.  Installation of CIT Manifolds

.  Installation of 9 o’clock Tube Bundle


.  CIT Sensor Leak Check

.  Installation of Igniters and Ignition Leads

.  Installation of Rear Sump Oil Supply Tube & Aft Sump Oil Scavenge Tube

.  Installation of No.5 Bearing Vibration Monitoring Kit Brackets

.  Installation of Turbine Air Cooling Tube and Manifold Assemblies

.  Installation of T4.95 Wiring Harness (6 Probes) (Configuration One)

.  Installation of T4.95 Blanking Plugs

.  Installation of T4.95 Extension Wiring Harness (6 Probes) (Configuration One)

.  Installation of Left and Right Extension

.  Installation of Connector Type 9 Probes Forward T4.95 Wiring Harness

.  Installation of No.5 Bearing Vibration Monitoring Kit Sensor

.  Final Inspection

.  Preliminary Inspection

.  Assembly of Booster

.  Assembly of Fan Disk with Booster Assembly

.  Installation of Stage 1 Vane Assembly on Fan Disk and Booster Assembly

.  Balancing of Booster Assembly

.  Installation of Stage 4 Vane Assembly

.  Final Inspection

.  Preliminary Inspection

.  Determine No.1 Bearing Oil Baffle Thickness

.  Rework No.1 Bearing Oil Baffle

.  Installation of No.1 Bearing Outer Race in Bearing Housing

.  Installation of Bearing Housing on No.1 Bearing Support

.  Installation of No.2 Bearing Outer Race & No.2 Bearing Oil Supply Tube Assembly

.  Installation of No.1 Bearing Sleeve

.  Installation of Forward Stationary Air/Oil Seal

.  Installation of No.1 Bearing Oil Baffle

.  Installation of Air Pressurization, Oil Scavenge and Drain Tubes

.  Installation of No.1 Bearing Assembly

.  Attachment of Tubes to No.1 Bearing Support Rear Flange

.  Installation of No.1 Bearing Inner Race Retaining Nut

.  Installation of Fan Shaft Rotating Air/Oil Separator

.  Installation of N1 Sensor Ring

.  Installation of No.2 Bearing Inner Race

.  Installation of No.2 Air/Oil Retaining Nut

.  Installation of No.1 Bearing Oil Manifold and No.1 & No.2 Bearing Oil Supply Tube Assembly

.  Impingement Check of No.1 Bearing Oil Nozzle with air

.  Installation of No.2 Bearing Support

.  Impingement Check of No.2 Bearing Oil Nozzle with air
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:CFM 56-3 Engine Disassembly and Assembly Capability(9)