.  Perform Rig Test of forward Bearing Sump Internal Oil Supply Tube

.  Installation of N1 Speed Sensor

.  Installation of Fan and Booster Rotor/Stator Assembly

.  Installation of Fan Duct Panels

.  Installation of Splitter Fairing

.  Machining of Abradable Liner

.  Installation of Fan Rotor Blades

.  Installation of Spinner Rear Cone

.  Complete the List of Complaints

 

 

.  Preliminary Inspection

.  Installation of HPC Rotor on Buildup Fixture

.  Installation of Combustion Assembly


.  Installation of HPT Rotor

.  Compressor Clearance Measurements andInstallation of HPC Linipot Sensor

.  Installation of HPC Stators and VSV SystemCheck

.  Installation of each of Stage 6, 7, 8 BorescopePlugs

.  Installation of Actuation Ring Connecting Links

.  Installation of Linipot Sensor on HPC Rotor andperform Runout Measurement

.  Installation of VSV Actuation Assemblies

.  Installation of Outside Piping and Brackets

.  Do VSV System Rig Check

.  Installation of External Hardware

.  Installation of Linipot Sensor and Cable on HPTRotor

.  Installation of HPT Shroud/Stage 1 LPT NozzleModule

.  Measure Runout of HPT Rotor

.  Measure and record Core Engine Major ModuleLength

.  Preliminary Inspection

.  Installation of LPT Shaft

.  Preparation of Turbine Frame and LPT Rotor/Stator Assembly for machining of Adjusting Sleeve

.  Preparation of Turbine Frame and LPT Rotor/Stator Assembly after machining of Adjusting Sleeve

.  Installation of LPT Rotor and Stator Assembly

.  Balancing of LPT Major Module

.  Installation of No.5 Bearing Outer Race

.  Installation of Turbine Frame

.  Final Inspection

.  Preliminary Inspection

.  Installation of CIT T25 Sensor

.  Installation of Hardware on TCC Timer & TCC Timer Electrovalve

.  Installation of TCC Timer Tubes

.  Installation of TCC Timer

.  Installation of Heat Shield onto TCC Timer Electrovalve

.  Installation of Power Management Control (PMC)

.  Installation of Alternator Electrical Lead Assembly and Control Parameter Wiring Harness

.  Installation of T2 & T12 Temperature Sensors

.  Installation of Chip Detector Kit (N/R per SB 79-0069)

.  Final Inspection

 

 

 

 

 

 

Edited by Li CFM56-3 Engine Disassembly and Assembly Capability -39 -Hao
Front Stator Assembly (Configuration One)
.  Preliminary Inspection

.  Installation of Upper HPC Front Stator
 