. Perform Rig Test of forward Bearing Sump Internal Oil Supply Tube
. Installation of N1 Speed Sensor
. Installation of Fan and Booster Rotor/Stator Assembly
. Installation of Fan Duct Panels
. Installation of Splitter Fairing
. Machining of Abradable Liner
. Installation of Fan Rotor Blades
. Installation of Spinner Rear Cone
. Complete the List of Complaints
. Preliminary Inspection
. Installation of HPC Rotor on Buildup Fixture
. Installation of Combustion Assembly
. Installation of HPT Rotor
. Compressor Clearance Measurements andInstallation of HPC Linipot Sensor
. Installation of HPC Stators and VSV SystemCheck
. Installation of each of Stage 6, 7, 8 BorescopePlugs
. Installation of Actuation Ring Connecting Links
. Installation of Linipot Sensor on HPC Rotor andperform Runout Measurement
. Installation of VSV Actuation Assemblies
. Installation of Outside Piping and Brackets
. Do VSV System Rig Check
. Installation of External Hardware
. Installation of Linipot Sensor and Cable on HPTRotor
. Installation of HPT Shroud/Stage 1 LPT NozzleModule
. Measure Runout of HPT Rotor
. Measure and record Core Engine Major ModuleLength
. Preliminary Inspection
. Installation of LPT Shaft
. Preparation of Turbine Frame and LPT Rotor/Stator Assembly for machining of Adjusting Sleeve
. Preparation of Turbine Frame and LPT Rotor/Stator Assembly after machining of Adjusting Sleeve
. Installation of LPT Rotor and Stator Assembly
. Balancing of LPT Major Module
. Installation of No.5 Bearing Outer Race
. Installation of Turbine Frame
. Final Inspection
. Preliminary Inspection
. Installation of CIT T25 Sensor
. Installation of Hardware on TCC Timer & TCC Timer Electrovalve
. Installation of TCC Timer Tubes
. Installation of TCC Timer
. Installation of Heat Shield onto TCC Timer Electrovalve
. Installation of Power Management Control (PMC)
. Installation of Alternator Electrical Lead Assembly and Control Parameter Wiring Harness
. Installation of T2 & T12 Temperature Sensors
. Installation of Chip Detector Kit (N/R per SB 79-0069)
. Final Inspection
Edited by Li CFM56-3 Engine Disassembly and Assembly Capability -39 -Hao
Front Stator Assembly (Configuration One)
. Preliminary Inspection
. Installation of Upper HPC Front Stator 中国航空网 www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:CFM 56-3 Engine Disassembly and Assembly Capability(8)