• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-11-19 23:31来源:蓝天飞行翻译 作者:航空

To view this page ensure that Adobe Flash Player version 9.0.124 or greater is installed.

曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

.  Check of Dimension LV

.  Determination of N1 Speed Sensor Adjustment Plate Thickness

.  Installation of No.1 and No.2 Bearing Support on Storage Stand

.  Final Inspection

.  Preliminary Inspection

.  Installation of Fan Frame Strut Internal & External Parts

.  Installation of Brackets on Fan Frame Flanges

.  Installation of Vibration Sensor Rear Guide Tube and Monitoring Parts

.  Installation of Variable Bleed Valve (VBV) System

.  Installation of Internal Parts on Fan Frame

.  Installation of Oil Tank Assembly and External Tubing on Fan Frame

.  Final Inspection

.  Preliminary Inspection

.  Installation of Blades in Stage 4-9 Spool

.  Installation of Blades in Stage 1-2 Spool

.  Balancing of Stage 1-2 Spool

.  Installation of Blades into Stage 3 Disk

.  Balancing of Stage 3 Disk

.  Installation of Compressor Rear Rotating (CDP) Air Seal

.  Preliminary Compressor Rotor Balance before Tip Grind

.  Tip Grind on Compressor Rotor Blade

.  Compressor Rotor Final Balance after Tip Grind

.  Final Inspection

 

 

 

 

 

 

 

 

 

 

 

 

Titanium Compressor Front Stator Assembly (Configuration One)
.  Preliminary Inspection

.  Installation of Anti-rotation Stop

.  Installation of Stage 5 Bleed Manifold Segments

.  Installation of Compressor Stator Case Half on Installation Stand

.  Installation of Stage 1, 2,3 and 4 Liner Sector Guides and Liner for Liner Gap Measurement

.  Apply RTV to Stage 1, 2 and 3 Liner Segments

.  Installation of Stage 1, 2 and 3 Liner Segments

.  Installation of Stage 4 and 5 Sector Guides, Vane Sectors and Stationary Seals for Gap Measurement

.  Installation of Stage 5 Liners

.  Installation of Stage 4 and 5 Vane Sectors

.  Assembly IGV, Stage 1, 2 and 3 Actuation Rings

.  Installation of Stage 3 vanes, Lever Arms, Actuation Ring, Shrouds and Bushings

.  Installation of Stage 2 vanes, Lever Arms, Actuation Ring, Shrouds and Bushings

 

 


Steel Compressor Front Stator Assembly (Configuration Two)
.  Installation of IGV’s, Lever Arms, Actuation Ring, Shrouds and Bushings

.  Measure Stage 1, 2 and 3 Shroud Circumferential Clearance (End Gaps)

.  Apply RTV to Stage 1, 2 and 3 Shrouds and Pins

.  Installation of Stage 1, 2 and 3 Shroud Seal Retainers

.  Assembly of Case Halves

.  Measure Circumferential Clearance of IGV Shrouds, IGV Seal Retainers and Stage 1, 2 & 3 Retainers
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:CFM 56-3 Engine Disassembly and Assembly Capability(10)