. Check of Dimension LV
. Determination of N1 Speed Sensor Adjustment Plate Thickness
. Installation of No.1 and No.2 Bearing Support on Storage Stand
. Final Inspection
. Preliminary Inspection
. Installation of Fan Frame Strut Internal & External Parts
. Installation of Brackets on Fan Frame Flanges
. Installation of Vibration Sensor Rear Guide Tube and Monitoring Parts
. Installation of Variable Bleed Valve (VBV) System
. Installation of Internal Parts on Fan Frame
. Installation of Oil Tank Assembly and External Tubing on Fan Frame
. Final Inspection
. Preliminary Inspection
. Installation of Blades in Stage 4-9 Spool
. Installation of Blades in Stage 1-2 Spool
. Balancing of Stage 1-2 Spool
. Installation of Blades into Stage 3 Disk
. Balancing of Stage 3 Disk
. Installation of Compressor Rear Rotating (CDP) Air Seal
. Preliminary Compressor Rotor Balance before Tip Grind
. Tip Grind on Compressor Rotor Blade
. Compressor Rotor Final Balance after Tip Grind
. Final Inspection
Titanium Compressor Front Stator Assembly (Configuration One)
. Preliminary Inspection
. Installation of Anti-rotation Stop
. Installation of Stage 5 Bleed Manifold Segments
. Installation of Compressor Stator Case Half on Installation Stand
. Installation of Stage 1, 2,3 and 4 Liner Sector Guides and Liner for Liner Gap Measurement
. Apply RTV to Stage 1, 2 and 3 Liner Segments
. Installation of Stage 1, 2 and 3 Liner Segments
. Installation of Stage 4 and 5 Sector Guides, Vane Sectors and Stationary Seals for Gap Measurement
. Installation of Stage 5 Liners
. Installation of Stage 4 and 5 Vane Sectors
. Assembly IGV, Stage 1, 2 and 3 Actuation Rings
. Installation of Stage 3 vanes, Lever Arms, Actuation Ring, Shrouds and Bushings
. Installation of Stage 2 vanes, Lever Arms, Actuation Ring, Shrouds and Bushings
Steel Compressor Front Stator Assembly (Configuration Two)
. Installation of IGV’s, Lever Arms, Actuation Ring, Shrouds and Bushings
. Measure Stage 1, 2 and 3 Shroud Circumferential Clearance (End Gaps)
. Apply RTV to Stage 1, 2 and 3 Shrouds and Pins
. Installation of Stage 1, 2 and 3 Shroud Seal Retainers
. Assembly of Case Halves
. Measure Circumferential Clearance of IGV Shrouds, IGV Seal Retainers and Stage 1, 2 & 3 Retainers 中国航空网 www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:CFM 56-3 Engine Disassembly and Assembly Capability(10)