• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-11-19 23:31来源:蓝天飞行翻译 作者:航空

To view this page ensure that Adobe Flash Player version 9.0.124 or greater is installed.

曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

.  Apply RTV to IGV Shrouds

.  Installation of Actuation Ring Connecting Links on Upper and Lower Ring

.  VSV Travel Checks

.  Actuation Ring Guide Pad Settings

.  Installation of Borescope Plugs

.  Measure ID of Compressor Front Stator Shroud and Seal Retainers

.  Flowpath Measurement

 


Configuration One
Configuration
.  Preliminary Inspection

.  Installation of Spring Loaded Anti-rotation Stop

.  Installation of Sector Guides and Liners (Config. One)

.  Installation of Sector Guides (Config. Two)

.  Measurement of Liner End Gap (Config. One)

.  Installation of Liner Grind Spacers (Config. One)

.  Preparation of Case for Liner machining (Config. One)

.  Machining of Liners (Config. One)

.  Post Machining of Liners (Config. One)

.  Installation of Stage 6-8 Vane Sectors and Seals for Gap Measurement (Config. One)

.  Installation of Stage 6-8 Vane Sectors (Config. Two)

.  Installation of Stage 6-8 Vane Sectors and Stage 6-9 Liners (Config. One)

.  Measurement of Compressor Rear Stator

.  Measure and record Liner Min.& Max. Radius

.  Preparation of Case for Engine assembly

 

 

 

 

.  Preliminary Inspection

.  Assembly of HPC Rear Stator Support to Combustion Case

.  Assembly of HPT Inner Stationary Seal

.  Installation of Borescope Plugs and Cover Plates

.  Assembly of Slabbed Head Bolts to Combustion Chamber


.  Installation of Combustion Chamber into Combustion Case

.  Installation of HPT Forward Nozzle Inner Support into Combustion Case

.  Installation of HPT Bolt Shields, Nut Shields and Bolt Erosion Shields

.  Installation of Fuel Nozzles

.  Installation of Fuel Manifolds and Fuel Drain Manifolds

.  Leak Check of Fuel Manifolds Assembly Connections

.  Assembly of Fuel Drain Manifold

.  Installation of Fuel Drain Manifold Clamps

.  Installation of HPT Nozzle Assembly into Combustion Case

.  Subassembly of HPT Aft Outer Seal and Seal Support

.  Installation of HPT Nozzle Aft Stator Seals

.  Measurement of Axial Dimension J39F

.  Installation of Igniter Bushings

 

 

3M72-42-00A001 Combustion Chamber Assembly
. Receiving Inspection

 

 


.  Preliminary Inspection

.  Assembly of Nozzle Segments and Seals

.  Assembly of Inner Support to Nozzle Segments

.  Assembly of Outer Support to Nozzle Segments

.  Assembly of Outer Seals to Forward Flange of Nozzle Segments Outer Band


 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:CFM 56-3 Engine Disassembly and Assembly Capability(11)