• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-11-19 23:31来源:蓝天飞行翻译 作者:航空

To view this page ensure that Adobe Flash Player version 9.0.124 or greater is installed.

曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

.  Remove Radial Bevel Gear Lock Nut

.  Remove Bearing and Spacer from Radial Bevel Gear

.  Apply Corrosion Preventive Oil

.  Visually Inspect exposed areas of Sub-assemblies

.  Incoming Inspection

.  Disassemble Radial Drive Shaft

.  Disassemble Input Bevel Gear

.  Remove TGB External Parts

.  Disassemble Horizontal Drive Shaft Housing & Horizontal Bevel Gear

.  Visually Inspect exposed areas of Sub-assemblies

.  Incoming Inspection

.  Disassemble Control Alternator 47-Tooth No.1 Drive Gearshaft

.  Disassemble Fuel Pump Drive Pad W/31x61, 73 & 41-Tooth No.3, 4 & 5 Gearshafts

.  Disassemble 44x73-Tooth No.7 Intermediate Gear Cluster

.  Disassemble 44-Tooth No.9 Lubrication Unit Drive Gearshaft

.  Disassemble 62-Tooth No.2 Handcranking Drive Gearshaft

.  Disassemble 55-Tooth No.6 IDG Drive Gearshaft

.  Disassemble 73-Tooth No.8 Hydraulic Pump Drive Gearshaft

.  Remove AGB Housing Internal Parts

.  Remove AGB Housing External Parts

.  Visually Inspect exposed areas of Sub-assemblies

 

 

 

 

 

 

 

 

 

 

 

MTU Maintenance Zhuhai

Edited by Li CFM56-3 Engine Disassembly and Assembly Capability -30 -Hao


3M71-00-00A001 Installation
N/A

 

 

.  Preliminary Inspection

.  Installation of Engine Forward Mount Assembly

.  Installation of Engine Rear Mount Assembly

.  Installation of Engine Core Drain Tubes

.  Installation of Extension Ring/Engine Core Drain Tube


.  Installation of Extension Ring/5th and 9th Stage Bleed Control System

.  Installation of Fan Case Brackets

.  Installation of Accessory Gearbox Brackets

.  Installation of Core Brackets

.  Installation of Left Strut Drain Lines

.  Installation of Accessory Drain Tubes

.  Installation of Right Strut Drain Lines

.  Installation of Oil Tank Scupper Drain Line

.  Installation of Fuel Flow Transmitter

.  Installation of Fuel Inlet Line

.  Installation of Fuel Filter Differential Pressure Switch

.  Removal of Lower Bleed Control System

.  Removal of Upper 5th and 9th Bleed Control System

.  Installation of Right and Left Lower 9th Bleed Duct System and Installation of Lower 5th Stage Bleed Duct System

.  Installation of Right and Left Upper Bleed System 9th Stage / Installation of Left Upper Bleed System 5th Stage

 

 


.  Installation of Fan Air/Pre-Cooler Control Valve

.  Installation of Pressure Regulating and Shutoff Valve (PRSOV)
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:CFM 56-3 Engine Disassembly and Assembly Capability(6)