• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-09-23 22:27来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

January 1, 2004
73-21
SOUTHWEST AIRLINES PROPRIETARY(c) All rights reserved
SOUTHWEST AIRLINES.
737-700 MAINTENANCE TRAINING MANUAL
ENGINE FUEL AND CONTROL - ENGINE CONTROL - EEC BITE - EEC TEST 2 General Here are additional MCDU screens for the EEC test.
January 1, 2004
73-21
- 20 -
SOUTHWEST AIRLINES PROPRIETARY(c) All rights reserved
SOUTHWEST AIRLINES.
737-700 MAINTENANCE TRAINING MANUAL
FROM PG 1

A73-21-00-213.fm
TO PG 3 TO PG 1
ENGINE FUEL AND CONTROL - ENGINE CONTROL - EEC BITE - EEC TEST 2
January 1, 2004
73-21
SOUTHWEST AIRLINES PROPRIETARY(c) All rights reserved
SOUTHWEST AIRLINES.
737-700 MAINTENANCE TRAINING MANUAL
ENGINE FUEL AND CONTROL - ENGINE CONTROL - EEC BITE - EEC TEST 3 General Here are additional MCDU screens for the EEC test.
January 1, 2004
73-21
- 22 -
SOUTHWEST AIRLINES PROPRIETARY(c) All rights reserved
SOUTHWEST AIRLINES.
737-700 MAINTENANCE TRAINING MANUAL
FROM PG 2

EEC CHANNEL B
DATA NOT AVAILABLE
BOTH EEC CHANNELS OK


A73-21-00-215.fm
ENGINE FUEL AND CONTROL - ENGINE CONTROL - EEC BITE - EEC TEST 3

January 1, 2004
73-21
- 23 -
SOUTHWEST AIRLINES PROPRIETARY(c) All rights reserved
SOUTHWEST AIRLINES.
737-700 MAINTENANCE TRAINING MANUAL
ENGINE FUEL AND CONTROL - ENGINE CONTROL - EEC BITE -T/R INTLK 1
General
The T/R LEVER INTLK TEST does a test to make sure the EEC can operate the thrust lever interlock.
NOTE:  The MCDU screen will show a warning about operation of the thrust reverser during this test.
You select START TEST on the GROUND TEST T/R LEVER INTLK TEST page and follow the procedure in 73-21 of the AMM part II and the steps on the MCDU to do the test.
The T/R LEVER INTLK TEST first does a test of channel A then repeats the test for channel B. When the tests are complete, you select TEST RESULTS. The EEC shows the faults that were found or shows the TEST PASSED message. You next select END TEST or REPEAT TEST. If you select END TEST, the TEST COMPLETE page shows on the MCDU. If one channel of the EEC does not operate, the TEST COMPLETE page tells you which channel does not operate.
If you select abort during the test, the test stops and the MCDU shows the test abort page.
January 1, 2004
73-21
- 24 -
SOUTHWEST AIRLINES PROPRIETARY(c) All rights reserved
SOUTHWEST AIRLINES.
737-700 MAINTENANCE TRAINING MANUAL
FROM PG 2
A73-21-00-217.fm

January 1, 2004
73-21
SOUTHWEST AIRLINES PROPRIETARY(c) All rights reserved
SOUTHWEST AIRLINES.
737-700 MAINTENANCE TRAINING MANUAL
ENGINE FUEL AND CONTROL - ENGINE CONTROL - EEC BITE -T/R INTLK 2 General These are additional MCDU screens for the T/R LEVER INTLK TEST.
January 1, 2004
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-700 MAINTENANCE TRAINING MANUAL BITE HANDBOOK 机务培训手册 自测手册(85)