27-31-00
ALL ú ú 01 Page 105 ú Jun 20/92
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
757
FAULT ISOLATION/MAINT MANUAL
CENTER SYSTEM
PRESSURE REDUCING
PRESSURE REDUCER VALVE
BYPASS VALVE SEE I
SEE H
ELEVATOR PRESSURE
REDUCER/BYPASS VALVES
SEE F
RIGHT SYSTEM LEFT SYSTEM PRESSURE REDUCING PRESSURE REDUCING VALVE VALVE
SEEG SEEJ
ELEVATOR PRESSURE REDUCER/BYPASS VALVES F
RIGHT SYSTEM PRESSURE REDUCING VALVE GElevator Control System - Component Location Figure 102 (Sheet 5)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
27-31-00
ALL ú ú 01 Page 106 ú Jun 20/92
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
757
FAULT ISOLATION/MAINT MANUAL
PRESSURE REDUCER BYPASS VALVE
H
CENTER SYSTEM PRESSURE REDUCING VALVE I
LEFT SYSTEM PRESSURE REDUCING VALVE J
Elevator Control System - Component Location (Details from Sht 5)Figure 102 (Sheet 6)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
27-31-00
ALL ú ú 01 Page 107 ú Jun 20/92
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
757 MAINTENANCE MANUAL
ELEVATOR CONTROL SYSTEM - ADJUSTMENT/TEST
_________________________________________
1. General_______
A. This procedure contains these tasks for the operational test, adjustment, and system tests for the elevator control system:
(1)
Elevator Control System - Operational Test
(2)
Elevator Control System - Adjustment
(3)
Elevator Control System - System Test
(4)
Elevator Column and Quadrant Override Test
(5)
Elevator Pressure Bypass Valve Test (Procedure 1 and 2)
(6)
Elevator with Each Hydraulic System
B.
The "Elevator Control System - System Test" task contains the instructions to do tasks "Elevator Column and Quadrant Override Test" and "Elevator Pressure Bypass Valve Test (Procedure 1 and 2)" shown above. Thus, if you do all the steps in the "Elevator Control System - System Test" task, it will not be necessary to do tasks "Elevator Column and Quadrant Override Test" and "Elevator Pressure Bypass Valve Test (Procedure 1 and 2)".
Tasks "Elevator Column and Quadrant Override Test" and "Elevator Pressure Bypass Valve Test (Procedure 1 and 2)" are necessary only for scheduled maintenance.
TASK 27-31-00-715-331
2. Elevator Control System - Operational Test__________________________________________
A. General
(1) This task contains the operational test procedure for the elevator control system, which contains these topics:
-
Elevator Control System
-
Elevator System Override
B.
References
(1)
AMM 24-22-00/201, Electrical Power - Control
(2)
AMM 29-11-00/201, Main (Left, Right, and Center) Hydraulic Systems
C.
Access
(1)
Location Zones
211/212 Control Cabin
D.
Prepare for the Operational Test
(1)
Supply electrical power (AMM 24-22-00/201).
S 215-333
(2)
Make sure these circuit breakers on the overhead panel, P11, are closed:
(a)
EICAS (6 locations)
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:757 AMM 飞机维护手册 飞行操纵 FLIGHT CONTROLS 3(4)