• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-21 08:06来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

HORIZONTAL STABILIZER REAR SPAR (REF)
FWD
ELEVATOR POSITION TRANSMITTER (REF)ACTUATOR (3 LOCATIONS) ELEVATOR POWER CONTROL
ELEVATOR POWER CONTROL ACTUATORS (LEFT SIDE) (RIGHT SIDE THE SAME) INBD
E
Elevator Control System - Component Location Figure 102 (Sheet 4)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-31-00
 ALL  ú ú 01 Page 105 ú Jun 20/92
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

757
FAULT ISOLATION/MAINT MANUAL

CENTER SYSTEM 
PRESSURE REDUCING 
PRESSURE REDUCER  VALVE 
BYPASS VALVE  SEE  I 
SEE  H 
ELEVATOR PRESSURE 
REDUCER/BYPASS VALVES 
SEE  F 

RIGHT SYSTEM LEFT SYSTEM PRESSURE REDUCING PRESSURE REDUCING VALVE VALVE
SEEG  SEEJ
ELEVATOR PRESSURE REDUCER/BYPASS VALVES F
RIGHT SYSTEM PRESSURE REDUCING VALVE GElevator Control System - Component Location Figure 102 (Sheet 5)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-31-00
 ALL  ú ú 01 Page 106 ú Jun 20/92
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

757
FAULT ISOLATION/MAINT MANUAL

PRESSURE REDUCER BYPASS VALVE
H

CENTER SYSTEM PRESSURE REDUCING VALVE I
LEFT SYSTEM PRESSURE REDUCING VALVE J
Elevator Control System - Component Location (Details from Sht 5)Figure 102 (Sheet 6)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 27-31-00
 ALL  ú ú 01 Page 107 ú Jun 20/92
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
757 MAINTENANCE MANUAL
 ELEVATOR CONTROL SYSTEM - ADJUSTMENT/TEST
_________________________________________
 1.  General_______
 A.  This procedure contains these tasks for the operational test, adjustment, and system tests for the elevator control system:
 (1)  
Elevator Control System - Operational Test

 (2)  
Elevator Control System - Adjustment

 (3)  
Elevator Control System - System Test

 (4)  
Elevator Column and Quadrant Override Test

 (5)  
Elevator Pressure Bypass Valve Test (Procedure 1 and 2)

 (6)  
Elevator with Each Hydraulic System

 B.  
The "Elevator Control System - System Test" task contains the instructions to do tasks "Elevator Column and Quadrant Override Test" and "Elevator Pressure Bypass Valve Test (Procedure 1 and 2)" shown above. Thus, if you do all the steps in the "Elevator Control System - System Test" task, it will not be necessary to do tasks "Elevator Column and Quadrant Override Test" and "Elevator Pressure Bypass Valve Test (Procedure 1 and 2)".


 Tasks "Elevator Column and Quadrant Override Test" and "Elevator Pressure Bypass Valve Test (Procedure 1 and 2)" are necessary only for scheduled maintenance.
 TASK 27-31-00-715-331
 2.  Elevator Control System - Operational Test__________________________________________
 A.  General
 (1)  This task contains the operational test procedure for the elevator control system, which contains these topics:
 -
Elevator Control System

 -
Elevator System Override

 B.  
References


 (1)  
AMM 24-22-00/201, Electrical Power - Control

 (2)  
AMM 29-11-00/201, Main (Left, Right, and Center) Hydraulic Systems

 C.  
Access

 (1)  
Location Zones
 211/212 Control Cabin


 D.  
Prepare for the Operational Test

 (1)  
Supply electrical power (AMM 24-22-00/201).

 S 215-333

 (2)  
Make sure these circuit breakers on the overhead panel, P11, are closed:

 (a)  
EICAS (6 locations)
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:757 AMM 飞机维护手册 飞行操纵 FLIGHT CONTROLS 3(4)