(2)
24-22-00/201, Electrical Power - Control
(3)
29-11-00/201, Main (Left, Right, and Center) Hydraulic Systems
C.
Access
(1)
Location Zones 211/212 Control Cabin 311/312 Area Aft of Pressure Bulkhead to BS 1787.45
(2)
Access Panel 311AL Pressure Reducer Valves and Bypass Valve
D.
Prepare for the Removal
(1)
Supply electrical power (Ref 24-22-00/201).
S 864-002
(2)
Do the step that follows to remove the left or right pressure reducer valve or the bypass valve:
(a)
Remove the pressure from the right and left hydraulic systems and reservoirs (Ref 29-11-00/201).
S 864-001
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
27-31-13
ALL ú ú 01 Page 401 ú Dec 20/90
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
757
MAINTENANCE MANUAL
PRESSURE REDUCER VALVES AND BYPASS VALVE
SEE A REDUCER VALVE FOR THE CENTER HYDRAULIC SYSTEM
SEE E
BYPASS VALVE
FOR THE REDUCER
REDUCER VALVE VALVES
HYDRAULIC SYSTEM FOR THE RIGHT SEE C LEFT HYDRAULIC SYSTEM REDUCER VALVE FOR THE
SEE B SEE D
PRESSURE REDUCER
VALVE AND BYPASS VALVE
A
HYDRAULIC
LINES (3 LOCATIONS)
ELECTRICAL
CONNECTOR
(2 LOCATIONS)
BOLT WASHER (3 LOCATIONS)
REDUCER VALVE FOR THE RIGHT HYDRAULIC SYSTEM
B
Pressure Reducer Valves and Bypass Valve Figure 401 (Sheet 1)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
27-31-13
ALL ú ú 01 Page 402 ú Dec 20/90
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
757
MAINTENANCE MANUAL
BOLT
HYDRAULIC 1
WASHER
LINES
(3 LOCATIONS)
(4 LOCATIONS)
BYPASS VALVE FOR THE REDUCER VALVES
C
HYDRAULIC LINES (3 LOCATIONS)
HYDRAULIC
LINES
(3 LOCATIONS)
ELECTRICAL CONNECTOR (2 LOCATIONS)
BOLT WASHER (3 LOCATIONS)
BOLT
REDUCER VALVE FOR THE LEFT HYDRAULIC SYSTEM
WASHER (3 LOCATIONS)
D
ELECTRICAL
CONNECTOR
(2 LOCATIONS)
REDUCER VALVE FOR THE CENTER HYDRAULIC SYSTEM
E 1 INSTALL THE WASHER WITH THE COUNTERSINK SIDE NEXT TO THE BOLT HEAD
Pressure Reducer Valves and Bypass Valve Figure 401 (Sheet 2)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
27-31-13
ALL ú ú 01 Page 403 ú Dec 20/90
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
757
MAINTENANCE MANUAL
15.89 |0.01 INCHES (403.60 |0.25 mm), DO THE STEPS THAT FOLLOW:
1.
PUT THE GAGE ASSEMBLY AGAINST THE BALLSCREW SO THAT THE BOLT HEADS ARE ON THE SHOULDERS OF THE UPPER AND LOWER STOPS
2.
MAKE SURE THAT THE FEELER BLADE CAN BE PUT BETWEEN THE BOLT HEAD OF THE GAGE ASSEMBLY AND ON THE SHOULDER OF THE UPPER STOP (THIS WILL PREVENT PRELOADING)
Measurement of Stabilizer Dimension B
Figure 402
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
27-31-13
ALL ú ú 01 Page 404 ú Jan 28/02
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:757 AMM 飞机维护手册 飞行操纵 FLIGHT CONTROLS 3(101)