• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-13 08:07来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 35-21-08
 ALL  ú ú 16 Page 403 ú Jun 18/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

STATION BODY BUTTOCK LINE  LINE WATER  ACCESS THROUGH 

440.0  20.0 R  390.0  LAVATORY (AMM 35-21-19/401). REMOVE THE ATTENDANT'S OXYGEN BOX IN THE UPPER DECK 

Bleed Relief Valve Location and Access
Figure 402

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 35-21-08
 ALL  ú ú 13 Page 404 ú Feb 10/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
C22123
A
747-400
MAINTENANCE MANUAL

 C. Access
 (1)  Location Zone
 200 Upper Half Fuselage

 D. Procedure
 S 914-018
 (1)  
Read and obey the safety precautions and general instructions before you do the maintenance (AMM 35-00-00/201).

 S 434-009

 (2)  
Remove the protective cap or plug from the adapter.

 S 214-019

 (3)  
Examine the fittings (threads) to make sure they are clean.

 S 434-010

 (4)  
Install new O-ring on the bleed relief valve if necessary.


 S 424-011
 CAUTION: ATTACH A WRENCH TO THE FLAT SIDES OF THE ADAPTER AND HOLD
_______ THE ADAPTER WHEN YOU REMOVE THE BLEED RELIEF VALVES. THIS WILL PREVENT DAMAGE TO THE DISTRIBUTION LINES.
 (5)  
Turn the screw threads of the bleed relief valve into the adapter, and tighten to a torque value of 65 to 80 pound-inches.

 S 434-012

 (6)  
Install the safety wire.

 S 414-013

 (7)  
Put back all the items that were removed to get access to the bleed relief valves (Figure 402).


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 35-21-08
 ALL  ú ú 14 Page 405 ú Jun 18/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 S 864-025
 WARNING:_______ OPEN THE SHUTOFF VALVE ON EACH OXYGEN CYLINDER SLOWLY.  IF NOT,
 HIGH TEMPERATURES CAN OCCUR WHICH CAN START AN IGNITION WITH
 THE OXYGEN.  THIS CAN CAUSE INJURY TO PERSONS AND DAMAGE TO THE
 AIRPLANE AND EQUIPMENT.
 CAUTION:_______ DO NOT TIGHTEN THE SHUTOFF VALVE ON EACH OXYGEN CYLINDER MORE
 THAN 25 POUND-INCHES.  THIS CAN CAUSE DAMAGE TO THE SHUTOFF

 VALVE.
 (8)  
Open the shutoff valve on each oxygen cylinder:

 (a)  
Slowly turn the shutoff valve until it is fully open. NOTE: The shutoff valve can be closed by hand which is

____ equivalent to 25 pound-inches.

 (b)  
Close the shutoff valve one-fourth of a turn.

 (c)
Install a lockwire on the shutoff valve. S 794-026

 

 (9)  
Do the Task: Oxygen Low Pressure Leak Test (AMM 35-21-00/501), to do a check for leaks.

 S 414-016

 (10)
 Close the access panels to oxygen cylinders.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 35-21-08
 ALL  ú ú 10 Page 406 ú Oct 18/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 BLEED RELIEF VALVE - ADJUSTMENT/TEST
____________________________________
 1.  General_______
 A.  This task is included in this procedure:
 (1) Functional test of the bleed relief valve
 B.  Bleed relief valves are installed in the distribution lines for the low oxygen pressure. Access and location to the bleed relief valves are shown in 35-21-08/401.
 TASK 35-21-08-705-001
 2.  Bleed Relief Valve Functional Test__________________________________
 A.  Special Tools and Equipment
 (1) ME65B50263-3 - Leak Test Kit, Passenger Oxygen System
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 氧气 OXYGEN(82)