• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-13 08:07来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 C.  The unitized valve assembly is installed in each oxygen box at the the areas identified below. You must open the oxygen box to get access to to the unitized valve assembly.
 (1)  
Lavatories

 (2)  
Crew Rest

 (3)  
IPC 35-21-05


 TASK 35-21-05-004-001
 2.  Supernumerary Unitized Valve Assembly Removal (Fig. 401)
_____________________________________________
 A.  Standard Tools and Equipment
 (1)  Caps and Plugs - Package of Clean Protective
 B.  References
 (1)  
35-00-00/201, Oxygen

 (2)  
35-21-19/401, Oxygen Box

 (3)  
IPC 35-21-05


 C.  Access
 (1)  Location Zone
 200 Upper Half Fuselage

 D.  Procedure
 S 914-002
 (1)  
Read and obey the safety precautions and general instructions before you do the maintenance (Ref 35-00-00/201).

 S 014-003

 (2)  
Open the access panels to the oxygen cylinders which are attached by snaps and velcro tape.


 S 844-004
 CAUTION: DO NOT TIGHTEN THE SHUTOFF VALVE ON EACH OXYGEN CYLINDER MORE
_______ THAN 25 POUND-INCHES. THIS CAN CAUSE DAMAGE TO THE SHUTOFF VALVE.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 35-21-05
 ALL  ú ú 01A Page 401 ú Feb 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
UNITIZED VALVE ASSEMBLY


STREAMERS ARE NOT INSTALLED ON ALL THE MASKS  A-A
Supernumerary Unitized Valve Assembly Installation (Example) Figure 401
L83348
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 35-21-05
 ALL  ú ú 01A Page 402 ú Feb 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 (3)  Close the shutoff valve on each oxygen cylinder slowly.
 NOTE: The shutoff valve can be tightened by hand which is
____
 equivalent to 25 pound-inches.

 S 014-005
 (4)  
Remove the oxygen box (Ref 35-21-19/401).

 S 024-006

 (5)  
Remove the unitized valve assembly.

 (a)  
Remove the pintels from the mask shutoff valves.

 (b)  
Remove the mask hoses from the manifold outlets.

 (c)  
Remove the fasteners connecting the unitized valve assembly to the oxygen box.

 (d)  
Remove the unitized valve assembly from the oxygen box.

 


 S 034-007
 (6)  Install the protective caps or plugs to open lines, fittings, or ports to prevent contamination of the system.
 TASK 35-21-05-004-008
 3. Supernumerary Unitized Valve Assembly Installation (Fig. 401)
__________________________________________________
 A. References
 (1)  
35-00-00/201, Oxygen

 (2)  
35-21-19/401, Oxygen Box

 (3)  
IPC 35-21-05


 B. Access
 (1)  Location Zone
 200 Upper Half Fuselage

 C. Procedure
 S 914-009
 (1)  
Read and obey the safety precautions and general instructions before you do the maintenance (Ref 35-00-00/201).

 (2)  
Remove the protective caps or plugs from lines, fittings or ports.

 (3)
Examine the fitting (threads) to make sure they are clean.


 S 434-010
 S 214-011
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 35-21-05
 ALL  ú ú 01A Page 403 ú Feb 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 S 424-012
 WARNING: MAKE SURE ALL THE MASK SHUTOFF VALVES ARE IN THE OPENED (DOWN)
_______ POSITION. IF THIS IS NOT DONE, OXYGEN WILL NOT GO THE OXYGEN MASKS WHEN THE OXYGEN MASKS ARE OPERATED. THIS CAN CAUSE INJURY TO PERSONS AND DAMAGE TO THE AIRPLANE OR EQUIPMENT.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 氧气 OXYGEN(75)