• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-03 11:42来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

A
737-300/400/500MAINTENANCE MANUAL
 WING-TO-BODY FAIRING BLOWOUT PANEL - REMOVAL/INSTALLATION
_________________________________________________________
 1.  General
_______
 A.  This procedure contains two tasks. The first task is the removal of the blowout panel for the wing-to-body fairing.
 B.  The blowout panels have a hinge on one side. The rivets that go through the clips on the other side hold the blowout panels closed.
 TASK 53-51-11-004-001-B00
 2.  Remove the Blowout Panel for the Wing-to-Body Fairing
_____________________________________________________
 A.  Standard Tools and Equipment
 (1)  Wooden or plastic spatula
 B.  Consumable Materials
 (1)  
A00310 Sealant - Pro-Seal 898 (optional: BMS 5-79, Class B)

 (2)  
G00287 Parting Agent - Delchem X-769


 C.  Access
 (1)  Location Zones
 200 Lower Half of Fuselage

 D.  Procedure
 S 014-002-B00
 (1)  
If the panel blows out, open the underwing fairing and remove the rivets.

 S 144-003-B00

 (2)  
Use a wooden or plastic spatula to clean the sealant from the mating surfaces.

 S 124-004-B00

 (3)  
Apply an abrasion resistant finish and parting agent to the outer face of the fairing lip (Ref 51-21-81/701).

 S 144-005-B00

 (4)  
Remove the sealant from the clearance between the blowout panel and panel cutout.


 S 394-006-B00
 CAUTION: BE CAREFUL WHEN YOU APPLY HAND PRESSURE TO PUT THE BLOWOUT
_______ PANEL IN THE CORRECT POSITION. TOO MUCH PRESSURE CAN CAUSE DISTORTION OF THE BLOWOUT PANEL.
 (5)  
Before you install the blowout panel, apply a bead of sealant to the inner face of the panel lip (Ref 51-31-00/201).

 S 864-007-B00

 (6)  
After the sealant dries, open and close the blowout panel to make sure it does not bond.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 53-51-11
 ALL  ú ú B02 Page 401 ú Jul 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 TASK 53-51-11-404-008-B00
 3.  Install the Blowout Panel for the Wing-to-Body Fairing______________________________________________________
 A. Consumable Materials
 (1) Rivets - MS20470A, 3/32-inch diameter and 1/8-inch diameter
 B. Access
 (1)  Location Zones
 200 Lower Half of Fuselage

 C. Procedure
 S 214-009-B00
 (1)  
Examine the attach clips for damage.

 S 434-010-B00

 (2)  
Install the blowout panels with one rivet, 3/32-inch diameter, in the aft outboard location and one rivet, 1/8-inch diameter, in the forward outboard location.

 (3)  
Close and latch the blowout panel.


 S 864-011-B00
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 53-51-11
 ALL  ú ú B01 Page 402 ú Jul 15/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 FORWARD WING-TO-BODY FAIRING - REMOVAL/INSTALLATION
___________________________________________________
 1.  General_______
 A. This procedure has these tasks:
 (1)  
Forward Wing-to-Body Fairing Removal.

 (2)  
Forward Wing-to-Body Fairing Installation.


 TASK 53-51-19-004-001-B00
 2.  Forward Wing-to-Body Fairing Removal____________________________________
 A. General
 (1)  The wing-to-body fairing will be referred to as the fairing in this task.
 B. References
 (1)  
AMM 12-31-21/201, Body Section 43 Access Doors and Panels

 (2)  
AMM 12-31-31/201, Body Section 46 Access Doors and Panels


 C. Access
 (1)  Location Zone
 300/400 Left Wing/Right Wing

 D. Procedure
 S 034-002-B00
 (1)  If it is necessary, remove or disconnect the equipment that is attached to the fairing.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 机身 FUSELAGE(18)