(5) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1R EFF : ALL ∞∞28-42-00∞∞∞∞∞∞∞∞∞∞Page B256
May 01/05 CES
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
TASK 28-42-00-810-822
Fuel Quantity/CIC Probe 39QT, Center Tank
WARNING : OBEY THE FUEL SAFETY PROCEDURES.
_______
WARNING : WHEN YOU DO WORK ON THE FUEL SYSTEM WIRING, YOU MUST USE TEST
_______ EQUIPMENT THAT IS APPROVED (REFER TO INTERNATIONAL OR NATIONAL SPECIFICATIONS FOR INTRINSICALLY SAFE TEST EQUIPMENT, E.G. EN50-020, UL913 OR EQUIVALENT). TEST EQUIPMENT THAT IS NOT APPROVED CAN CAUSE FIRE OR AN EXPLOSION.
1. Possible Causes
_______________
- FQIC (3QT)
- HARNESS-CHAN B, CTR TK (18QT)
- PROBE-FUEL QTY, NO 5 AND CIC, CTR TK GROUP B (39QT)
- aircraft wiring
- fused adaptor at 7512VC
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific multimeter
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
AW 284216W01 ESPM 20-00-00 ESPM 20-52-21 ESPM 20-52-22
AMM 24-41-00-861-002
AMM 24-41-00-862-002
R R AMM AMM AMM AMM 28-10-00-910-001 28-10-00-910-002 28-42-00-740-003 28-42-00-740-007
Energize the Aircraft Electrical Circuits from the External PowerDe-energize the Aircraft Electrical Circuits Supplied from the External PowerSafety Procedures When You Do Work in a Fuel TankAccess to the Fuel Tanks and the Work AreasInterrogation of the FQIS Input Parameters Pages Interrogation of the (SMITHS INDUSTRIES) FQIS Trouble Shooting Data
「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1R EFF : 001-049, 051-099, 101-149, 151-199, ∞∞28-42-00∞∞∞∞∞∞∞∞∞∞Page B257
201-299, 401-499, Aug 01/05 CES
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
AMM 28-42-15-000-002 Removal of the Center Tank Fuel-Quantity-Probe (35QT, 36QT, 37QT, 38QT, 39QT) AMM 28-42-15-400-002 Installation of the Center Tank Fuel-Quantity-Probe (35QT, 36QT, 37QT, 38QT, 39QT) AMM 28-42-34-000-001 Removal of the Fuel Quantity-Indicating Computer (FQIC) (3QT) AMM 28-42-34-400-001 Installation of the Fuel Quantity-Indicating Computer
(FQIC) (3QT) AMM 28-42-44-000-002 Removal of the Center Tank Harness 18QT AMM 28-42-44-400-002 Installation of the Center Tank Harness 18QT AMM 31-32-00-860-001 Procedure to Get Access to the SYSTEM REPORT/TEST
Menu Page
AMM 31-60-00-860-001 EIS Start Procedure
AMM 31-60-00-860-002 EIS Stop Procedure
AMM 32-12-00-010-001 Open the Main Gear Doors for Access
AMM 32-12-00-410-001 Close the Main Gear Doors after Access
R AMM 28-42-00 P.Block 001 QUANTITY INDICATING ASM 28-42/09 AWM 28-42-16
3. Fault Confirmation
__________________
A. Table of the circuit breakers used in this procedure:
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU FUEL/FQI/CHAN/1 1QT A13 121VU FUEL/FQI/CHAN/2 2QT M27
B. Test
(1) To keep the number of computer replacements (with no fault found) to a minimum, do the power on BITE test of the FQIS as follows:
(a) If the FQIS is not energized:
1 Close the C/Bs 1QT and 2QT.
_
2 Energize the Aircraft Electrical Circuits from the External
_ Power (Ref. AMM TASK 24-41-00-861-002).
(b) If the FQIS is energized, reset the FQIC as follows:
1 Open the C/Bs 1QT and 2QT.
_
2 Wait 5 seconds.
_
「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1R EFF : 001-049, 051-099, 101-149, 151-199, ∞∞28-42-00∞∞∞∞∞∞∞∞∞∞Page B258
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320 Trouble Shooting Manual 排故手册 FUEL 燃油3(38)