Subtask 72-00-00-010-078
B. Open the fan cowl doors (Ref. TASK 71-13-00-010-040):
FOR 1000EM1
437AL, 438AR
FOR 1000EM2
447AL, 448AR.
Subtask 72-00-00-040-063
C. Make the thrust reverser unserviceable (Ref. TASK 78-30-00-481-041).
F 『 EEFF : ALL E Page 64472-00-00
E E Aug 01/05 E E ECES E
F 『
E C F M E
E E
E 56-5B E
E E
Subtask 72-00-00-010-083
D. Open the thrust reverser doors (Ref. TASK 78-36-00-010-040):
FOR 1000EM1
451AL, 452AR
FOR 1000EM2
461AL, 462AR
4. Procedure
_________
R (Ref. Fig. 606/TASK 72-00-00-991-308, 607/TASK 72-00-00-991-309, 608/TASK 72-00-00-991-321)
Subtask 72-00-00-210-071
A. Over-serviceable-limit Extensions
-------------------------------------------------------------------------------
CONDITION MAX EXTENSION
-------------------------------------------------------------------------------
1. Fan and booster
A. Spinner front cone
(1) Damaged surface protection greater than 50 50 cycles percent of total surface
B. Fan blade
(1) Fully missing molydag on inner faces of the 250 cycles platforms
(2) Flaking of Cu.Ni.In coating on blade dovetail Examine blades for pressure faces (contact areas), up to 10 serviceability. percent if there is no indication of wear on (Ref. TASK 72-21-base material 00-210-006) 1200
cycles after relubrication. Repeat extension is permitted
F 『 EEFF : ALL E Page 64572-00-00
E E Aug 01/05 E E ECES E F 『 E C F M E E E E 56-5B E
R Booster Rotor and Stator Damage Extended Figure 606/TASK 72-00-00-991-308
F EEFF : E E ECES ALL 『E 72-00-00EEE Page 646 Aug 01/05
F 『
E C F M E
E E
E 56-5B E
E E
INTENTIONALLY BLANK
F 『R E E Page 64772-00-00
E E Aug 01/05 E E ECES E F 『 E C F M E E E E 56-5B E F 『 E C F M E E E E 56-5B E F 『 E C F M E E E E 56-5B E
R Extended Vanes Damage Limits Figure 607/TASK 72-00-00-991-309- 12 (SHEET 1)
F EEFF : E E ECES ALL 『E 72-00-00EEE Page 648 Aug 01/05
R Extended Vanes Damage Limits Figure 607/TASK 72-00-00-991-309- 22 (SHEET 2)
F EEFF : E E ECES ALL 『E 72-00-00EEE Page 649 Aug 01/05
Inspection/Check of the Fan Outlet Guide Vanes (OGV) R Figure 608/TASK 72-00-00-991-321- 13 (SHEET 1)
F 『 EEFF : ALL E Page 65072-00-00
E E Aug 01/05 E E ECES E F 『 E C F M E E E E 56-5B E
Inspection/Check of the Fan Outlet Guide Vanes (OGV) R Figure 608/TASK 72-00-00-991-321- 23 (SHEET 2)
F 『 EEFF : ALL E Page 65172-00-00
E E Aug 01/05 E E ECES E F 『 E C F M E E E E 56-5B E
Inspection/Check of the Fan Outlet Guide Vanes (OGV) R Figure 608/TASK 72-00-00-991-321- 33 (SHEET 3)
F 『 EEFF : ALL E Page 65272-00-00
E E Aug 01/05 E E ECES E -------------------------------------------------------------------------------CONDITION MAX EXTENSION -------------------------------------------------------------------------------
F 『
E C F M E
E E
E 56-5B E
E E
(3) Flaking of Cu.Ni.In coating on blade dovetail Examine blades for
pressure faces (contact areas), more than 10 serviceability.
percent and less than 50 percent if there is (Ref. TASK 72-21-
no indication of wear on base material 00-210-006) 400
cycles after
relubrication.
Repeat extension is
not permitted
(4) Shingling at mid span shrouds Turn the shingled
blades to the 12
o'clock position
and unshingle with
hand force or by
using a piece of
wood. Examine
blades for
serviceability
(Ref. TASK 72-21-
00-210-009) Remove
and send the
shingled blades to
a shop for a
dimensional and an
F.P.I. inspection
in less than 50
cycles.
(5) Nicks, dents, scratches and sheared edges on 50 cycles
midspan shroud surfaces up to 0.035 in. (0.89
mm) deep if defects are not in the midspan
中国航空网 www.aero.cn