 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
71-13-00-010-040 Opening of the Fan Cowl Doors 72-23-00-991-315 Fig. 408
 3. Job Set-up
__________ Subtask 72-23-00-941-086
 A. Safety Precautions
 (1) On the center pedestal, on the ENG panel 115VU:

 (a) Put a warning notice to tell persons not to start the engine.

 (2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.

 (3) On the overhead maintenance panel 50VU:


 (a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
 F 『 EEFF : ALL E Page 44872-23-00
 E E May 01/05 ERE
ECES E

 F 『
 E C F M E
 E E
 E 56-5B E
 E E


 (b) Put a warning notice to tell persons not to energize the FADEC 1(2).
 Subtask 72-23-00-010-103
 B. Get Access
 (1) Open the fan cowl doors: (Ref. TASK 71-13-00-010-040)
 FOR 1000EM1
 437AL, 438AR
 FOR 1000EM2
 447AL, 448AR


 (2) Put the access platform in position.


 4. Procedure
_________ (Ref. Fig. 408/TASK 72-23-00-991-315) Subtask 72-23-00-020-065
 A. Removal of the PS13 Line CAUTION : USE 2 WRENCHES TO REMOVE/INSTALL THE TUBE UNION NUT: ONE TO
_______ HOLD THE FITTING, THE OTHER TO LOOSE/TORQUE THE NUT. OTHERWISE, DAMAGE TO THE HARDWARE CAN OCCUR.
 (1) Cut and remove the lockwire.

 (2) Disconnect the PS13 line from the PS13 boss on the fan frame.

 (3) Cut and remove the lockwire.

 (4) Disconnect the PS13 line from the ECU.


 F 『 EEFF : ALL E Page 44972-23-00
 E E May 01/05 ERE
ECES E F 『 E C F M E E E E 56-5B E F 『 E C F M E E E E 56-5B E

 

 Removal/Installation of the PS13 Line Figure 408/TASK 72-23-00-991-315- 12 (SHEET 1)
 F EEFF : E ER ECES  ALL  『E 72-23-00EE E Page 450 May 01/05

 


 Removal/Installation of the PS13 Line Figure 408/TASK 72-23-00-991-315- 22 (SHEET 2)
 F EEFF : E ER ECES  ALL  『E 72-23-00EE E Page 451 May 01/05


 F  『
 E  C F M  E
 E  E
 E  56-5B  E
 E  E


 (5) Remove the parts which attach the PS13 line to the fan frame as follows:
 -------------------------------------------------------------------------------REMOVE FROM NOTE -------------------------------------------------------------------------------
Nut (10)  Bracket (20) on flange F  At the 4:45 o'clock
 Bolt (40)  position (Detail B)
 Nut (80)  Bracket (60) on flange F  At the 4:30 o'clock
 Bolt (50)  position (Detail C)
 Clamp (70)
 Nut (120)  Bracket (110) on flange F  At the 4 o'clock
 Bolt (90)  position (Detail D)
 Clamp (100)
 Nut (140)  Bracket (150) on flange F  At the 3:45 o'clock
 Bolt (130)  position (Detail E)
 Clamp (160)
 Nuts (200)  Brackets (180) on flange G  At the 3 o'clock,
 Bolts (170)  2 o'clock and 1:30 o'clock
 Clamps (190)  positions (3 locations)
 (Detail F)
 Nut (240)  Bracket (220) on flange G  At the 2:30 o'clock
 Bolt (210)  position (Detail G)
 Clamp (230)

 F 『 EEFF : ALL E Page 45272-23-00
 E E May 01/05 ERE
ECES E TASK 72-23-00-400-029

 F  『
 E  C F M  E
 E  E
 E  56-5B  E
 E  E


 Installation of the PS13 Line
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific warning notice No specific access platform 1.5 m (4 ft. 11 in.) No specific Torque Wrench : range 36.00 to 220.00 lbf.in
 (0.40 to 2.60 m.daN)
 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
 