F 『 EEFF : ALL E Page 82472-21-00
E E May 01/05 E E ECES E 5. Close-up
F 『
E C F M E
E E
E 56-5B E
E E
________ Subtask 72-21-00-869-070
A. Make sure that the work area is clean and clear of tool(s) and other items.
Subtask 72-21-00-942-069
B. Close Access
(1) Remove the access platform(s).
(2) Remove the warning notice(s).
F 『 EEFF : ALL E Page 82572-21-00
E E Aug 01/00 ERE
ECES E
F 『
E C F M E
E E
E 56-5B E
E E
TASK 72-21-00-320-004
Blending of the Stage 1 Booster Vane Assembly
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific soft file
No specific warning notice
No specific access platform 0.5 m (1 ft. 8 in.)
B. Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. CP2189 *
durite G422 (Ref. 70-30-00)
Material No. CP2191 *
durite G421 (Ref. 70-30-00)
C. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
70-51-00-230-002 Fluorescent-Penetrant Inspection-Portable-Water
Washable
72-21-00-000-007 Removal of the Fan Rotor Blades
72-21-00-400-007 Installation of the Fan Rotor Blades
R 72-21-00-991-330 Fig. 806
F 『 EEFF : ALL E Page 82672-21-00
E E May 01/00 E E ECES E E 56-5B E
F 『
E C F M E
E E
E E
3. Job Set-up
__________
Subtask 72-21-00-941-076
A. Safety Precautions
(1) On the center pedestal, on the ENG panel 115VU:
(a) Put a warning notice to tell persons not to start the engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(3) On the overhead maintenance panel 50VU:
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put a warning notice to tell persons not to energize the FADEC 1(2). 1(2).
(4) Put an access platform in position.
4. Procedure
_________ R (Ref. Fig. 806/TASK 72-21-00-991-330) Subtask 72-21-00-020-074
A. Remove the Fan rotor blades (Ref. TASK 72-21-00-000-007).
Subtask 72-21-00-220-055
B. Check for dimensions and location of defects on edge and compare with
repair limits. R (Ref. Fig. 806/TASK 72-21-00-991-330)
Subtask 72-21-00-320-053
C. Perform blending of defects using a soft file or strips of durite G422 (Material No. CP2189) or durite G421 (Material No. CP2191), used dry.
(1) Remove a minimum of 0.01 in. (0.25 mm) of base metal in addition to depth of defect.
F 『 EEFF : ALL E Page 82772-21-00
E E May 01/00 E E ECES E F 『 E C F M E E E E 56-5B E Subtask 72-21-00-230-053
R Blending of a Stage 1 Vane Assembly Leading Edge Figure 806/TASK 72-21-00-991-330
F EEFF : E E ECES ALL 『E 72-21-00EEE Page 828 May 01/00
F 『
E C F M E
E E
E 56-5B E
E E
D. Fluorescent penetrant inspect reworked area (Ref. TASK 70-51-00-230-002). No crack is allowed.
5. Close-up
________ Subtask 72-21-00-420-078
A. Install the fan rotor blades (Ref. TASK 72-21-00-400-007). Subtask 72-21-00-869-071
B. Make sure that the work area is clean and clear of tool(s) and other items.
Subtask 72-21-00-942-070
C. Close Access
(1) Remove the access platform(s).
(2) Remove the warning notice(s).
F 『 EEFF : ALL E Page 82972-21-00
E E May 01/00 E E ECES E
F 『
E C F M E
E E
E 56-5B E
E E
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM ENGINE 发动机 1(114)