• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-26 09:26来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.


 F 『 EEFF : ALL E Page 40180-11-20
 E E Aug 01/05 E E ECES E

 F 『
 E C F M E
 E E
 E 56-5B E
 E E
 (3) On the overhead maintenance panel 50VU:

 (a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.

 (b) Put a warning notice to tell persons not to energize the FADEC 1(2).


 (4) On the AIR COND panel 30VU:

 - make sure that the APU BLEED pushbutton switch is released (ON legend is off),

 - put a warning notice to tell persons not to operate the pneumatic system.

 

 (5) On the HP ground connector:


 - put a warning notice to tell persons not to pressurize the pneumatic system.
R **ON A/C 301-399,

R Subtask 80-11-20-941-053-A

R A. Safety Precautions

R (1) On the center pedestal, on the ENG panel 115VU:

R (a) Put a warning notice to tell persons not to start the engine.

R (2) Make sure that the engine 1(2) shutdown occurred not less than 5
R minutes before you do this procedure.

R (3) On the overhead maintenance panel 50VU:

R (a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2)
R pushbutton switch is off.

R (b) Put a warning notice to tell persons not to energize the FADEC
R 1(2).

R (4) On the AIR COND panel 30VU:
R - make sure that the APU BLEED pushbutton switch is released (OFF
R legend is on),
R - put a warning notice to tell persons not to operate the pneumatic
R system.

 F 『 EEFF : ALL E Page 40280-11-20
 E E May 01/04 E E ECES E F 『 EEFF : ALL E Page 40380-11-20

 F  『
 E  C F M  E
 E  E
 E  56-5B  E
 E  E 


R R R  (5) On the HP ground connector: - put a warning notice to tell persons not to pressurize the pneumatic system. 
R  **ON A/C ALL
 Subtask 80-11-20-010-055
 B. Open the fan cowl doors: (Ref. TASK 71-13-00-010-040) FOR 1000EM1 437AL, 438AR FOR 1000EM2 447AL, 448AR
 4. Procedure_________
 (Ref. Fig. 401/TASK 80-11-20-991-300)
 Subtask 80-11-20-020-053
 A. Removal of the starter shutoff valve
 (1) Disconnect the 2 electrical connectors (20 and 30) from the starter shutoff valve (50). Use soft-nose connector pliers only if necessary.
 (2) Remove the 2 V-clamps (10 and 40) which attach the valve to the upper and lower ducts.
 (3) Remove the starter shutoff valve (50).
 (4) Install blanking caps on all openings.
 (5) Install blanking plugs on the electrical connectors.

 E E May 01/04 E E ECES E F 『 E C F M E E E E 56-5B E TASK 80-11-20-400-003

 

 Starter Control Valve Figure 401/TASK 80-11-20-991-300
 F EEFF : E ER ECES  ALL  『E 80-11-20EE E Page 404 May 01/04


 F  『
 E  C F M  E
 E  E
 E  56-5B  E
 E  E


 Installation of the Starter Shutoff Valve
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific fiber hammer No specific soft nose connector pliers No specific warning notice No specific Torque Wrench : range 36.00 to 220.00 lbf.in
 (0.40 to 2.60 m.daN)
 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. CP2101  USA MIL-T-5544 graphite grease (Ref. 70-30-00)
 C. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
71-00-00-710-001 Dry Motoring Check 71-13-00-010-040 Opening of the Fan Cowl Doors 71-13-00-410-040 Closing of the Fan Cowl Doors 80-11-20-991-300 Fig. 401
 F 『 EEFF : ALL E Page 40580-11-20
 E E May 01/04 ERE
ECES  E

 F 『
 E C F M E
 E E
 E 56-5B E
 E E


 3. Job Set-up
__________
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 起动 STARTING(16)