Different languages (PASCAL and PL/M)
 -
Different algorithms.
 A specific methodology applied from the design phase to the programming
 phase ensures a safety level compatible with the FAC functions.
 Specific monitoring functions are introduced:
-In the hardware (watchdog)
 -in the software (real-time monitor)
 to ensure the correct execution of the software.
 The software is organized in fast or slow tasks and in background tasks
 which can be delayed.
 We therefore have:
 -
A fast cycle (yaw computation)
 -
A slow cycle (computation of other functions except weight)
 -
A very slow cycle (weight computation).
1EFF : ALL 1 22-66-00Page 6 1 1 Feb 01/98 1 1 1CES 1
 FLIGHT AUGMENTATION COMPUTER (FAC) - DEACTIVATION/REACTIVATION
______________________________________________________________
 TASK 22-66-00-040-001
 Deactivation of the FAC 2
 1. Reason for the Job
__________________
 Refer to the MMEL TASK: 22-66-01-B)
 Flight Augmentation
 Flight Augmentation Computer
 FAC 2
R (FAA Only)
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific  warning notice
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-41-00-861-002  Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power
 3. Job Set-up
__________
 Subtask 22-66-00-861-050
 A. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).
 1EFF : ALL 1 22-66-00Page 401 1 1 Nov 01/98 1 1 1CES 1
 Subtask 22-66-00-865-050
 B. Make sure that this(these) circuit breaker(s) is(are) closed:
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
121VU AUTO FLT/FAC2/28VDC 5CC2 M19
 4. Procedure
_________
 Subtask 22-66-00-040-050
 A. Deactivation of the FAC 2
 (1) On the overhead panel 24VU, release the FLT CTL/FAC 2 pushbutton R switch (the OFF legend goes on).
 (2) Open and safety tag the circuit breaker 5CC2 (ignore the related warnings).
 5. Close-up
________
 Subtask 22-66-00-942-050
 A. Safety Precautions
 (1) Put a warning notice on the FLT CTL/FAC2 pushbutton switch, to tell the crew that the FAC 2 is deactivated.
 (a)
 Make an entry in the log-book.
 Subtask 22-66-00-862-050
 B.
 De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002).
 1EFF : ALL 1 22-66-00Page 402 1 1 May 01/03 1 1 1CES 1
TASK 22-66-00-440-001
 Reactivation of the FAC 2
 1. Reason for the Job
__________________
 Refer to the MMEL TASK: 22-66-01-B)
 Flight Augmentation
 Flight Augmentation Computer
 FAC 2
R (FAA Only)
 2. Job Set-up Information
______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-41-00-861-002  Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power
 3. Job Set-up
__________
 Subtask 22-66-00-861-051
 A. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002). Subtask 22-66-00-865-051
 B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 