• 热门标签

当前位置: 主页 > 航空资料 > 国外资料 >

时间:2010-08-10 16:53来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

accepted or not by AIB. When the aircraft is accepted by the Flight Test
organization it is under the responsibility of that organization.
Handover to Programs Planning Milestone in the Aircraft production. Official session which takes place at the
end of the Aircraft assembly to compare the Aircraft status with its definition. At
the end, the Aircraft is accepted or not by Programs. When the aircraft is
accepted by the Flight Test organization it is under the responsibility of that
organization.
Hardcore Fleet Aircraft Identification A hardcore fleet covers the basic configuration of all aircraft of the Leasing
Company.
ACMR
Highlight Code Customer Services/Contractual
Technical Publications
A numeric code identifying the reason for change within a manual for automatic
inclusion in the highlights list when an electronic publishing system is used.
eg: 01 = Modification XXXXX incorporated,
eg: 09 = Layout improved/material relocated.
AMM, ASM, TSM and AWM
Highlights Customer Services/Contractual
Technical Publications
List at the front of a manual/chapter specifying the changes for a given revision
with a reason for each change.
Illustrated Provisioning
Document
Customer Services/Spares The IPD provides illustrations (Part 1) and parts list (Part 2) covering units and
components/Line Replaceable Units (LRUs) installed on the aircraft and is used
during the initial provisioning period until the customized Illustrated Parts
Catalog (IPC) is available.
Implement Organization/Management
Implementation
To fulfill, perform. WD
Improvement Manufacturer
Program for Airbus
Customer Training
Training Airbus Customer Training's strategy to improve the dispatch reliability factor at
the aircraft entry into service and to improve the immediate response to
unpredictable demand, as well as to better adapt services to market demand.
Approved Terms © Airbus SAS 2007. All rights reserved. Confidential and proprietary document.
37/79
19 Mar 07
Term Domain Definition Source
Lexinet - Airbus Reference Language
Approved Terms
Incident Aircraft Operation/Unscheduled
Occurrences
Extract from AP2509 (June 02),
Airbus Accident Investigation Policy and Procedure Guide.
"An incident is an occurrence other than an accident or a serious incident,
associated with the operation of an aircraft, which affects or could affect safety
in the broadest sense."
AP2509
Indenture Customer Services/Contractual
Technical Publications
The process of indentation in documents such as the Illustrated Parts Catalog/
Illustrated Parts List (IPC/IPL) which shows the relationship between an item
and its next higher assembly within a cascade.
Industrial Choice Industrialization For A340/A330 it relates to a list of options which have to be added to an
aircraft at Basic Build Status, to achieve an Industrial Standard.
Industrial Standard Aircraft Identification Code representing additional features added to a standard definition before
allocation of the aircraft to a Customer.
The code consists of a digit representing the standard, the feature and a neutral
character.
For the time being, it is only used to introduce propulsion system related
definitions (e.g. 1A*).
Industrialization Industrialization Actions jointly undertaken by Design Offices, Production, Procurement,
Inspection and Quality Organizations to bring the development of an aircraft, or
a product, from the experimental status (Prototype) to Series production, taking
into consideration the economic, industrial and quality aspects.
Industrialization Dossier Industrialization Documentation that is necessary and sufficient for a product to be produced in
compliance with the initial technical specification and guaranteeing
reproducibility and the required quality. The industrialization dossier is made up
of the Definition Dossier, Manufacturing Dossier and Inspection Dossier.
ACE glossary
In-Flight Performance
Computation Program
Aircraft Operation/Performance
Engineering
The IFP permits the computation of the performance for each phase of flight
under various conditions (aircraft flight configuration, engine thrust,
temperature, wind, number of engines in operation...). The IFP works from the
High Speed (HSP) data base.
A300B/A310/A300-600/A320
Informed Organization/Management
Implementation
I in RASCI.
Status of a person who must be Informed after a decision is made.
AP2075 module 1
Approved Terms © Airbus SAS 2007. All rights reserved. Confidential and proprietary document.
38/79
19 Mar 07
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:航空资料4(36)