• 热门标签

当前位置: 主页 > 航空资料 > 航空英语 >

时间:2010-05-01 18:40来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

LOG.WIPT Logistics Working-level IPT
LOGAM II Logistics Analysis Model II.
LOGFAC Logistics Feasibility Analysis Capability.
LOGFOR Logistics Force.
Logistics The science of planning and carrying out the movement and maintenance of
forces. In its most comprehensive sense, it includes those aspects of military
operations which deal with: (1) design and development, acquisition, storage,
movement, distribution, maintenance, evacuation, and disposition of materials;
(2) movement, evacuation, and hospitalization of personnel; (3) acquisition or
construction, maintenance, operation, and disposition of facilities; and (4)
acquisition or furnishing of services.
Logistics Support The supply and maintenance of materiel essential to proper operation of a
system in the force.
Logistics
Supportability
The degree to which planned logistics support (including test, measurement, and
diagnostic equipment; spares and repair parts; technical data; support facilities;
transportation requirements; training; manpower; and software support) allow
meeting system availability and wartime usage requirements.
MDA GLOSSARY, VER. 4.0 L
169
Logistics
Support Analysis
(LSA)
The selective application of scientific and engineering efforts undertaken during
the acquisition process, as part of the systems engineering process, to assist in:
causing support considerations to influence design; defining support
requirements that are related optimally to design and to each other; acquiring
the required support; and providing the required support during the operational
phase at minimum cost.
Logistics Support
Analysis Record
(LSAR)
A formal tool under MIL-STD 1388-2A that uses records/forms to document
operations and maintenance requirements, RAM, task analyses, technical data,
support/test equipment, facilities, skill evaluation, supply support, ATE and TPS,
and transportability. LSAR is the basis for training, personnel, supply
provisioning and allowances construction, support equipment acquisition,
facilities construction and preparation, and for maintenance.
LOGPLAN Logistics Plan.
LOGSIM Logistics Simulation Model.
LOI (1) Letter of Instruction. (2) Letter of Intent.
LOMEZ Low Altitude Missile Engagement Zone.
Long Lead Items
Long Range Air
Launched Target
(LRALT)
Those components of a system for which the times to design and fabricate are
the longest, and, therefore, to which an early commitment of funds may be
desirable in order to meet the earliest possible date of system completion.
Two-stage, air launched ballistic missile target being developed for MBRV-4.
Long Wavelength
Infrared (LWIR)
Thermal radiation emitted by a source in the electromagnetic spectrum
encompassing infrared wavelengths of 6 to 30 microns.
LOR Level of Repair Analysis (ILS term).
LORA Level of Repair Analysis (ILS term).
LOS (1) Line of Sight. (2) Large Optical Segment.
LOTS Logistics Over-The-Shore.
LOW Launch on Warning.
Low Altitude
Demonstration
System (LADS)
Part of the SBIRS Low Program Definition and Risk Reduction (PDRR) program
phase. The LADS will consist of a flight experiment and extensive ground
demonstrations by Boeing North American. The LADS flight experiment will be
launched in late FY99 to demonstrate the sensor performance of a SBIRS Low
concept and collect phenomenology data.
Low Earth Orbit
(LEO)
These satellites are at altitudes between 100 and 400 nautical miles. They
have short duration revolutions (about 90 minutes), short visibility envelopes (2.5
minutes up to 10 minutes over a tracking station), short life spans, and are most
subject to orbital perturbations due to atmospheric drag and earth gravitational
anomalies.
Low
Endoatmosphere
That portion of the earth's atmosphere, generally below 40 km altitude.
MDA GLOSSARY, VER. 4.0 L
170
Low-Rate Initial
Production (LRIP)
The production of a system in limited quantity to provide articles for operational
test and evaluation, to establish an initial production base, and to permit an
orderly increase in the production rate sufficient to lead to full-rate production
upon successful completion of operational testing.
LOWKATRER Low Weight Kinetic Energy Active Tracker.
LOWTRAN Atmospheric and Interstellar Background Signature Model.
LPAR Large Phased Array Radar.
LPD Low Probability of Detection.
LPE (1) Liquid Phase Epitaxy.
(2) Launch Point Estimate.
LPI Low Probability of Intercept.
LPS Limited Protection System.
LR Long Range.
LRA (1) Line-Replaceable Assembly. (2) Launch and Recovery Element.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:航空缩略语词典(77)