Product Baseline (1) Established by the detailed design documentation for each configuration
item. Normally includes Process baseline (type D spec), Material baseline
(type E spec), type C spec, and drawings.
(2) In configuration management, the initial approved technical
documentation (including, for software, the source code listing) defining a
configuration item during the production, operation, maintenance, and
logistic support of its life cycle.
Product
Configuration
Identification
The current approved technical documentation which defines the configuration
of a configuration item during the production, operation, maintenance, and
logistics support phases of its life cycle and which prescribes that necessary for:
fit and function characteristics of a CI (Configuration Item); the selected
functional characteristics for production acceptance; and the production
acceptance test.
Product
Improvement
Effort to incorporate a configuration change involving engineering and testing on
end items and depot repairable components, or changes on other than
developmental items to increase system or combat effectiveness or extend
useful military life. Usually results from user feedback.
MDA GLOSSARY, VER. 4.0 P
232
Product Manager The individual, designated by a materiel developer, who is delegated authority
and assigned responsibility for centralized management of a
development/acquisition program that does not qualify for
system/program/project management.
Product Security
(PRODSEC)
That physical security provided for selected DoD products (major, high cost,
politically sensitive systems with significant military value) at Department of
Defense contractor facilities to mitigate the risk of the government as a selfinsurer.
Defining and instituting product security during production are essential
to the delivery of uncompromised systems.
Production
Acceptance Test
and Evaluation
T&E of production items to demonstrate that items procured fulfill the
requirements and specifications of the procuring contract or agreements.
Production and
Deployment
Normally the fourth phase in the acquisition process following Milestone III.
Systems are procured, items are manufactured, operational units are trained,
and the systems are deployed.
Production
Baseline
The Acquisition Program Baseline (APB) approved at Milestone III, applicable to
the effort in Phase III, Production and Deployment.
Production
Control
The procedure of planning, routing, scheduling, dispatching, and expediting the
flow of materials, parts, subassemblies, and assemblies within the plant from the
raw state to the finished product in an orderly and efficient manner.
Production
Feasibility
The likelihood that a system design concept can be produced using existing
production technology while simultaneously meeting quality, production rate, and
cost requirements.
Production
Qualification Test
(PQT)
A technical test conducted post MS III to ensure the effectiveness of the
manufacturing process, equipment, and procedures. This testing also serves the
purpose of providing data for the independent evaluation required for materiel
release so that the evaluator can address the adequacy of the materiel with
respect to the stated requirements. These tests are conducted on a number of
samples taken at random from the first production lot, and are repeated if the
process or design is changed significantly, and when a second or alternative
source is brought on line. Program funding category -- Procurement.
Production
Readiness
The state or condition or preparedness of a system to proceed into production.
A system is ready for production when the producibility of the production design
and the managerial and physical preparations necessary for initiating and
sustaining a viable production effort have progressed to the point where a
production commitment can be made without incurring unacceptable risks that
will breach thresholds of schedule, performance, cost, or other established
criteria.
Production
Readiness
Review (PRR)
A formal examination of a program to determine if the design is ready for
production, production-engineering problems have been resolved, and the
producer has accomplished adequate planning for the production phase.
Performed toward the end of FSD. (Defense Systems Management College)
Prograde Orbit An orbit having an inclination of between 0° and 90° with the object moving in an
easterly direction. (Retrograde Orbit.)
MDA GLOSSARY, VER. 4.0 P
233
 