CPAF Cost Plus Award Fee.
CPAM Chief of Naval Operations Program Assessment Memorandum (Navy)
MDA GLOSSARY, VER. 4.0 C
64
CPAR Cost Performance Assessment Report.
CPAT Critical Process Assessment Tool
CPB Charged Particle Beam.
CPEV Communications/Processor [Network] Experimental Version.
CPFF Cost Plus Fixed Fee.
CPIF Cost Plus Incentive Fee.
CPIPT Cost-Performance Integrated Product (Process) Team.
CPM (1) Critical Path Method. (2) Contractor Performance Measurement.
CPP Critical Performance Parameter.
CPR Cost Performance Report.
CPR/NC Cost Performance Report/No Criteria (Contract management term).
CPS (1) Consolidated Program Summary.
(2) Competitive Prototyping Strategy.
(3) Current Program Status.
CPU Central Processing Unit (TelComm/Computer term).
CPX See Command Post Exercise.
CQAE Chief/Contract Quality Assurance Evaluator.
CR (1) Computer Resources. (2) Continuing Resolution (US Congress term).
CR-UAV Close Range Unmanned Aerial Vehicle.
CRA (1) Coordinating Review Authority. (2) Command Relationships Agreement
CRADA Cooperative Research and Development Agreement.
CRAM (1) Control Random Access Memory.
(2) Cross-tie Random Access Memory (Computer term).
CRB Configuration Review Board.
CRC Control and Reporting Center.
CRD (1) Capstone Requirements Document.
(2) Component Requirements Document.
CRDA Cooperative Research and Development Agreement.
CRG Communications Relay Groups (PATRIOT).
CRI Classification, Recognition and Identification.
CRISD Computer Resources Integrated Support Document
MDA GLOSSARY, VER. 4.0 C
65
Critical Design
Review (CDR)
A review conducted to determine that the detailed design satisfies the
performance and engineering requirements of the development specification; to
establish the detailed design compatibility between the item and other items of
equipment, facilities, computer programs, and personnel; to assess producibility
and risk areas; and to review the preliminary product specifications. Conducted
during Phase I, Demonstration and Validation (for prototypes) and Phase II,
Engineering and Manufacturing Development.
Critical
Information
Specific facts about friendly intentions, capabilities, and activities vitally needed
by adversaries for them to plan and act effectively so as to guarantee failure or
unacceptable consequences for friendly mission accomplishment.
Critical
Intelligence
Parameter
A threat capability or threshold established by the program, changes to which
could critically impact on the effectiveness and survivability of the proposed
system.
Critical Issues Those aspects of a system’s capability, either operational, technical, or other,
that must be questioned before a system’s overall suitability can be known, and
which are of primary importance to the decision authority in reaching a decision
to allow the system to advance into the next phase of design, development,
production, or post-production.
Critical
Operational
Issue
A key operational effectiveness or operational suitability issue that must be
examined in operational test and evaluation to determine the system’s capability
to perform its mission. A critical operational issue is normally phrased as a
question to be answered in evaluating a system’s operational effectiveness
and/or operational suitability.
Critical Path
Method
A technique that aids dependency of other activities and the time required to
complete. Activities, which when delayed have an impact on the total project
schedule, are critical and are said to be on the critical path.
Critical Risk The existence of a vulnerability that could cause exceptionally grave damage to
the viability or the operational effectiveness of the SDS.
Critical Security
Risk
The existence of a security vulnerability that, if exploited by an adversary, could
cause exceptionally grave damage to the viability of the BMD or the operational
effectiveness of the SDS. Critical risks assume an adversary’s capability to
cause major system disruption or degradation (e.g., single point failure),
destruction of mission-critical components, or usurpation of system functions.
Critical
Supporting
Technology
A technology that program management personnel consider a critical part of the
program being described.
CRLCMP Computer Resources Life-Cycle Management Plan.
CRM Computer Resources Management.
CRMP Computer Resources Management Plan.
CRO Chemical Release Observation.
CRP (1) Command and Reporting Post. (2) Control and Reporting Point (JFACC
 