Nav Data Database containing all FAA preferred and company routes, published 
waypoints, airways, SIDs, and STARs Marketing On-time performance history and sensitivity per city-pair, i.e., to/from 
hub; connecting passenger matrix and flight availability Flight Schedule Relational database linking all flights in the operating schedule; aircraft 
routing, fuel tankering and delay analyses
Tasks Involved in Flight Planning: 
There were two classes of tasks, important and support, identified for developing a flight plan at NWA: 
Important (“attended to first”) 
.  
Payload determination and coordination with load planners for weight and balance calculation
.  
Alternate airport determination
.  
Route selection
.  
Re-dispatch point determination for long range flights
.  
Aircraft minimum equipment verification
Supporting (“necessary to complete, not the first priority”) 
.  
Speed and altitude profile calculation, and estimation of flight time
.  
En route alternate selection (as required)
.  
Fuel requirement calculation and coordination with fuel loaders
.  
Coordination of the flight plan with the pilot
.  
Flight plan filing with the FAA
Historical information is also taken into account when assigning aircraft type and estimating load capacity requirements. NWA takes into account the last 7 calendar days and the last 7 same-day-of-the-week (i.e., the last 7 Tuesdays) when estimating load/passenger capacity requirements.
 