• 热门标签

当前位置: 主页 > 航空资料 > 空管资料 >

时间:2011-09-26 01:07来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

When the San Diego -to- DFW flight reports they will divert to ABQ, the sweep aircraft immediately requests a new route to ABQ. Meanwhile, the dispatcher will generate a new flight plan for the sweep aircraft, including the fundamental elements of payload, fuel, and route. It can be the case that the sweep aircraft cannot accommodate the full load of the disabled aircraft (i.e., a B747 has a malfunction and must divert, and the sweep aircraft is a B757). It is in this special case that the dispatcher may be called upon to find creative solutions to solve the problem of getting the payload to the distribution center. These solutions can include:
.  
diverting another airborne aircraft in the vicinity

.  
contracting with another airline or carrier to carry some of the payload

.  
contacting the local distribution center to determine if they can carry some of the payload, via truck, to another city for transport


Conclusions and Commentary
This system works well for the package carriers. It is the package carriers belief that the sweep aircraft is a “nuisance” to air traffic controllers because of it’s loitering behavior while waiting for assignment.

 

2.3 Inefficiencies Summary
The explicit inefficiencies documented appear to fall into the following general categories:
.  
Incomplete information (e.g., intent behind flight plan change)

.  
Poor timeliness, quality, or format of information

.  
Poor information transfer

.  
Lack of cooperation in meeting different stakeholder re-routing goals

.  
Inadequate equipage

.  
Conservative separation standards

.  
Lack of ability of ATC to accommodate dynamic replanning

.  
Invariable routes and procedures


These inefficiencies were not always explicitly tied to driving economic problems, that is, delays, inefficient fuel usage, etc., but it was clear to us that schedule-related economics were the main airline or operator drivers to which these inefficiencies were associated.
The last three items, expressed by the package carrier operator and in the ARTCC scenario, are related to the mainstream issues of Free Flight. The other inefficiencies relate more directly to CDM types of issues. These latter inefficiencies, which are the ones that will be focused on in our analysis, fall into two general categories: those due to stakeholders who have a vested interest in the process not being involved in the decision making; and those due to the decision makers not having the best information on which to make their decisions. Table 2 illustrates these inefficiencies. For many current day scenarios and airlines, the bottom right quadrant is representative of the biggest category of inefficiencies in the flight planning process, especially for en route strategic replanning.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:Airborne-Based Conflict Probe(36)