05-20-00
Maintenance Checks
AMM
All of the applicable items must be signed by authorized maintenance personnel. Record the completion of the check in the airplane log book. Complete a copy of the Maintenance Report (refer to Paragraph 5).
The Maintenance Checklist is divided into zones. The zones are:
A. Engine Compartment
All items forward of the firewall. It includes the cowlings and the propeller.
B. Front Fuselage
All items on the outside of the front fuselage from the firewall to the trailing edge of the wing. It includes the nose landing gear, the main landing gear, the canopy and rear door.
C. Cockpit
All items inside the fuselage shell from the aft face of the firewall to the aft face of the rear main bulkhead. It also includes the internal parts of the brake system.
D. Center Fuselage, Internal
All items inside the fuselage shell below the rear seats from the aft face of the rear main bulkhead to the baggage compartment. It includes the control systems on the aft main bulkhead and the baggage compartment.
E. Rear Fuselage
All items on the outside of the fuselage from the trailing edge of the wing to the front of the vertical stabilizer.
F. Tail
All items of the fuselage aft of the rear fuselage, vertical stabilizer and horizontal stabilizer.
G. Wings
All items on the left and right wings. It includes the ailerons, flaps and Pitot head.
H. General
Those items which include more than one zone at the same time. It includes items such as control checks which need one person in the cockpit and another person at the control surface.
Page 2 Doc # 6.02.01 09 Jan 2003 Rev. 4
05-20-00
AMM
Maintenance Checks
% 3. 5 Hour Engine Check (TAE)
% The 5 hour engine check must only be done on the TAE 125 Diesel engine at 5 hours since new.
% Do the 5 hour engine check with reference to the checklist for the 5 hour engine check in this Section. % Do all the tasks on the checklist. All items must be signed by TAE authorized maintenance personnel % (refer to Note in Paragraph 1). Record the completion of the 5 hour engine check in the engine log % book and in the airplane log book.
% 4. 2000 Hour Structural Check
% Do the 2000 Hour Structural Check with reference to the checklist for the 2000 Hour Structural Check % in this Section. Do all the tasks on the checklist. All items must be signed by authorized maintenance % personnel. Record the completion of the 2000 Hour Structural Check in the airplane log book.
Doc # 6.02.01 Page 3
Rev. 4 09 Jan 2003
05-20-00
Maintenance Checks
AMM
Maintenance Practices Maintenance Checklist DA 40
1. General
Enter the applicable data in the blocks below:
%
Registration : _________________ Date : _________________
Airplane S/N : _________________ Engine Type Engine S/N : : 9 Lycoming 9 TAE _________________
Airplane Operating Hours : _________________ Engine hours, TTSN/TSMOH : _________________
Check : _________________ (50, 100, 200, 1000 hr, Annual Inspection)
2. Preparation
Do the following items before you start the applicable check:
%
%
%
Interval (Flight Hours)
Inspection Items 50 100 200 1000 Initials
1. 2. 3. 4. Before you do the inspection: S Read the applicable Airworthiness Directives. S Read the applicable Service Bulletins. Examine the Log Books. Look specially for: S Life limited parts. S Reported problems. TAE version only: S Read the engine event-log. (Refer to Section 72-01). Clean the airplane fully. (Refer to Section 12-30). X X X X X X X X X X X X X X X
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:钻石40飞机维护手册 DA 40 SERIES AMM 1(38)