• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-05-24 14:36来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

A. Airplanes registered in the USA
The time limits given in Chapter 04 should be applied to ensure Continued Airworthiness of the DA 40 unless an alternate inspection program is agreed on with the FAA.
The manufacturer recommends that you apply the time limits and maintenance checklists given in Chapter 05. Annual and 100 hour inspections of the DA 40 airplane must include all inspection items as required by FAR 43, Appendix D in scope and detail of an annual/100 hour inspection.
B. Airplanes registered in other countries
The time limits given in Chapter 04 should be applied to ensure Continued Airworthiness of the DA 40 unless an alternate inspection program is agreed on with the competent National Airworthiness Authority.
The manufacturer recommends that you apply the time limits and maintenance checklists given in Chapter 05. National maintenance requirements must be complied with.
Doc # 6.02.01 Page 5
Rev. 4 09 Jan 2003

04-00-00
Limitations
AMM

Intentionally left blank
04-00-00
AMM
Maintenance Checks

CHAPTER 05

 TIME LIMITS AND MAINTENANCE
CHECKS

Doc # 6.02.01 Page 1
Rev. 4 09 Jan 2003

05-TITLE
Maintenance Checks
AMM

Intentionally left blank
05-TITLE
AMM
Maintenance Checks

TABLE OF CONTENTS
CHAPTER 05
TIME LIMITS AND MAINTENANCE CHECKS

1.
General ..............................................1


2.
Chapter Configuration ...................................1


3.
Words with Special Meanings .............................2

 

Section 05-10 Time Limits
1.
General ..............................................1


2.
Regulatory Authorities ...................................1


3.
Scheduled Maintenance Time Limits ........................1


4.
Component Time Limits..................................3


5.
Component Time Tracking................................6

 

Section 05-20 Scheduled Maintenance Checks
1. General ..............................................1

2. Maintenance Checklist ...................................1
% 3. 5 Hour Engine Check (TAE)...............................3
% 4. 2000 Hour Structural Check ...............................3

Doc # 6.02.01 Page 1
Rev. 4 09 Jan 2003

05-CONTENTS
Maintenance Checks
AMM

Maintenance Practices
Maintenance Checklist DA 40
1.
General ..............................................4


2.
Preparation ...........................................4


3.
Engine Ground Test.....................................5


4.
Maintenance Checklist Zones .............................7


5.
Maintenance Report....................................42


6.
Check Flight Report ....................................43


7.
Engine Ground Test Record..............................46

 

% 5 Hour Engine Check (TAE) % 1. General .............................................50 % 2. Checklist for the 5 Hour Engine Check......................50
% % 2000 Hour Structural Check DA 40 % 1. General .............................................51 % 2. Checklist for 2000 Hour Structural Check....................51 % 3. Findings Report .......................................54
Page 2 Doc # 6.02.01 09 Jan 2003 Rev. 4
05-CONTENTS
AMM
Maintenance Checks

Section 05-30
Flight-line Checks

1.
General ..............................................1


2.
Flight-Line Checks ......................................1


3.
Post-Flight Check ......................................1
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:钻石40飞机维护手册 DA 40 SERIES AMM 1(32)