• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-11 09:21来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (c)  
Move the clamp-on ammeter to the ground wire.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 30-71-00
 ALL  ú ú 01 Page 507 ú Jun 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 (d)  Make sure that the current in the ground wire is the same as that found in the power wire.
 S 085-036
 (5)  
Remove the clamp-on ammeter.

 S 415-048

 (6)  
Install the cargo liners or floor panels (AMM 25-52-01/401).

 S 715-046

 (7)
Do the same test procedure for a mid or water tank in-line heater.__________


___
S 865-049
 (8)  Close 414A24, WASTE & WATER LINE HTR MN PWR (gnd) circuit breaker on the P414, Left Power Distribution Center.
 M. Potable Water Tank Heater Test
 S 015-064
 (1)  
Remove the applicable cargo liners or floor panels to get access to the tank heater (AMM 25-52-01/401).

 S 485-060

 (2)
Connect a clamp-on ammeter around one of the heater power wires.

 S 715-061

 (3)  
Do a check of the tank heater operation:


 (a)  Make the heater thermostat cool with dry ice or coolant spray (the thermostat is in the tank next to the heater).
 NOTE: To use the coolant spray, apply the spray to the
____ thermostat for 2 seconds. After 5 seconds apply the spray again. Do this procedure as many times as necessary to make the thermostat sufficiently cool.
 (b)  Make sure the current is 0.7 amps or more.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 30-71-00
 ALL  ú ú 11 Page 508 ú Jun 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 S 085-065
 (4)  
Remove the clamp-on ammeter.

 S 415-063

 (5)
Install the cargo liners or floor panels (AMM 25-52-01/401).


 N. Test of the Heated Supply Hose Below the Water Tank
 S 865-077
 (1)  Make sure these circuit breakers are closed:
 (a)  P414 Panel:
 1) 414A23, WATER TANK HEATERS-B
 2) 414D4, WATER TANK HEATERS-A

 S 015-071
 (2)  
Remove the applicable cargo liners to get access to the water tank (AMM 25-52-01/401).

 S 485-072

 (3)
Connect a clamp-on ammeter around one of the heater power wires.

 S 725-074

 (4)  
Do a check of the heated hose operation:


 (a)  Make the heater thermostat cool with dry ice or coolant spray (the thermostat is part of the heated hose assembly).
 NOTE: To use the coolant spray, apply the spray to the
____ thermostat for 2 seconds. After 5 seconds apply the spray again. Do this procedure as many times as necessary to make the thermostat sufficiently cool.
 (b)  Make sure the current is 0.5 amps or more.
 S 085-075
 (5)  
Remove the clamp-on ammeter.

 (6)
Install the cargo liners that were removed (AMM 25-52-01/401).


 S 415-076
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 30-71-00
 ALL  ú ú 08 Page 509 ú Oct 18/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 RIBBON HEATERS - REMOVAL/INSTALLATION
_____________________________________
 1.  General_______
 A.  This subject has two tasks, one for the removal and one for the installation of the water line and waste drain ribbon heaters. In this procedure, you will get access to the heater, cut the electrical leads, remove tape from the heater, install the replacement heater, and make splices at the new heater wires.
 B.  The procedure for individual water line ribbon heaters are the same except for the number of inches between the turns on the hoses.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 防冰和排雨 ICE AND RAIN PROTECTION(85)