 Do the operational test of the APU fire-extinguishing loop/squib (Ref. TASK 26-22-00-710-001).

 (5)
 Do the operational test of the electric pump of the Blue hydraulic system (Ref. TASK 29-12-00-710-001).

 (6)
 Do the operational test of the manual deployment of the Ram Air Turbine and the functional test of the Ram Air Turbine (Ref. TASK 29-22-00-720-001).

 (7)
 Do the functional test of the avionics-compartment lighting (Ref. TASK 33-35-00-720-001).

 (8)
 Do the operational test of manual mask release (Ref. TASK 35-23-00-710-001).

 (9)
 Do the functional test of the Electronic Control Unit (ECU) (Ref. TASK 73-21-60-720-040).


 Subtask 31-10-00-710-066
 T. Test Program after Removal/Installation of the Panel 51VU
 (1) Do the operational test of the refuel system (Ref. TASK 28-25-00-710-003).
 Subtask 31-10-00-710-067
 U. Test Program after Removal/Installation of the Panel 52VU
 (1) Do the uploading procedure with portable data loader to load the R navigation data base of the FMGC (Ref. TASK 22-70-00-610-008).
 (2) Do the operational test of the AFS (Ref. TASK 22-96-00-710-001).
 1EFF : ALL 1 31-10-00Page 213 1 1 Nov 01/04 1 1 1CES 1 1EFF : ALL 1 31-10-00Page 214 1 1 Feb 01/03 1 1 1CES 1 1EFF : ALL 1 31-10-00Page 215 1 1 Aug 01/03 1 1 1CES 1 1EFF : ALL 1 31-10-00Page 216 1 1 Feb 01/03 1 1 1CES 1


 Subtask 31-10-00-710-068 
R  V. Test Program after Removal/Installation of the Panel 54VU
 The preliminary tests are sufficient (Ref. para. 4.A.).
 Subtask 31-10-00-710-069 
R  W. Test Program after Removal/Installation of the Panel 55VU
 The preliminary tests are sufficient (Ref. para. 4.A.).
 Subtask 31-10-00-710-070 
R  X. Test Program after Removal/Installation of the Panel 56VU
 (1) Do the operational test of the landscape camera (Ref. TASK 23-36-00-710-002).
 Subtask 31-10-00-710-071 
R  Y. Test Program after Removal/Installation of the Panel 60VU
 (1) Do the operational test of the Audio Management Unit (Ref. TASK 23-51-00-710-001).
 Subtask 31-10-00-710-072 
R  Z. Test Program after Removal/Installation of the Panel 61VU
 (1) Do the operational test of the Audio Management Unit (Ref. TASK 23-51-00-710-001).
 Subtask 31-10-00-710-073 
R  AA. Test Program after Removal/Installation of the Panel 62VU
 (1) Do the operational test of the Audio Management Unit (Ref. TASK 23-51-00-710-001).

 

 Subtask 31-10-00-710-074
 AB. Test Program after Removal/Installation of the Panel 63VU
 (1) Do the operational test of the service interphone (Ref. TASK 23-44-00-700-001).
 (2) Do the operational test of the Audio Management Unit (Ref. TASK 23-51-00-710-001).
 Subtask 31-10-00-710-075
 AC. Test Program after Removal/Installation of the Panel 64VU
 (1) Do the operational test of the Audio Management Unit (Ref. TASK 23-51-00-710-001).
 Subtask 31-10-00-710-076
 AD. Test Program after Removal/Installation of the Panel 108VU
 (1) Do the operational test of the mechanic call (Ref. TASK 23-42-00-710-001).
 (2) Do the operational test of the Audio Management Unit (Ref. TASK 23-51-00-710-001). 
R R  (3) Do the BITE test of the Emergency Locator Transmitter (ELT) system (Ref. TASK 25-65-00-740-001). 
R  (4) Do the operational test of the annunciator light test system on the EXT PWR panel 108VU (Ref. TASK 33-14-00-710-001). 
R  (5) Do the operational test of the APU (GTCP 36-300) (Ref. TASK 49-00-00-710-004). 
R  (6) Do the operational test of the APU (APS 3200) (Ref. TASK 49-00-00-710-008). 
R  (7) Do the operational test of the APU (131-9(A)) (Ref. TASK 49-00-00-710-010).

 

 Subtask 31-10-00-710-077 
R  AE. Test Program after Removal/Installation of the Panel 110VU
 (1) Do the operational test of the reset function (Ref. TASK 27-22-00-710-001).
 (2) Do the operational test of the parking brake system (Ref. TASK 32-45-00-710-001) .
 Subtask 31-10-00-710-078 
R  AF. Test Program after Removal/Installation of the Panel 111VU
 (1) Do the operational test of the general illumination (Ref. TASK 33-12-00-710-001).
 (2) Do the operational test of the electrical release strike (Ref. TASK 52-51-12-400-001) para. 4.D.
 Subtask 31-10-00-710-079 
R  AG. Test Program after Removal/Installation of the Panel 112VU
 (1) Do the operational test of the general illumination (Ref. TASK 33-12-00-710-001).
 