REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
34-14-00-710-003 Operational Test of the Attitude/Heading (ATT/HDG)
 Switching Function 34-35-00-710-001 Operational Test of the Head Up Display (HUD) 34-48-00-710-001 Operational Test of GPWS Ground Self-test Function 34-52-00-720-009 Functionnal Test of the Remote ATC Control Box 35-12-00-710-001 Operational test of the Crew Oxygen Distribution 35-23-00-710-001 Operational Check of Manual Mask Release 36-11-00-710-003 Operational Test of the Bleed Air System 49-00-00-710-004 Operational Test of the APU (4005KM) (GTCP 36-300) 49-00-00-710-008 Operational Test of the APU (APS 3200) 49-00-00-710-010 Operational Test of the APU (131-9(A)) 52-51-00-710-002 Operational Test of the Cockpit Door Lock System
 (CDLS)
R 52-51-12-400-001 Installation of the Electric Release Strike 73-21-60-720-040 Functional Test of the Electronic Control Unit (ECU) ESPM 20-52-10
 3. Job Set-up
__________
 Subtask 31-10-00-860-050
 A. Not applicable.
 4. Procedure
_________
 NOTE : Some aircraft do not have all the systems/functions referred to in
____ this procedure. Ignore the tests related to systems/functions that are not installed on your aircraft.
 Subtask 31-10-00-710-050
 A. Preliminary Tests
 (1)
 Do a visual check of the locking connectors (Ref. ESPM 20-52-10).

 (2)
 Do the operational test of the instrument and panel integral lighting (Ref. TASK 33-13-00-710-001).

 (3)
 Do the operational test of the annunciator light test system in the cockpit (Ref. TASK 33-14-00-710-001).


 1EFF : ALL 1 31-10-00Page 205 1 1 Feb 01/05 1 1 1CES 1 Subtask 31-10-00-710-051


 B. Test Program after Removal/Installation of the Panel 8VU
 (1)
 Do the operational test of the EFIS/ECAM switching functions (Ref. TASK 31-60-00-710-002).

 (2)
 Do the operational test of the AIR DATA switching function (Ref. TASK 34-13-00-710-001).

 (3)
 Do the operational test of the attitude/heading switching function (Ref. TASK 34-14-00-710-003).


 Subtask 31-10-00-710-052
 C. Test Program after Removal/Installation of the Panel 15VU
 (1) Do the operational test of the Audio Management Unit (Ref. TASK 23-51-00-710-001).
 Subtask 31-10-00-710-053
 D. Test Program after Removal/Installation of the Panel 16VU
 (1) Do the operational test of the Audio Management Unit (Ref. TASK 23-51-00-710-001).
 Subtask 31-10-00-710-054
 E. Test Program after Removal/Installation of the Panel 17VU
 (1) Do the operational test of the Audio Management Unit (Ref. TASK 23-51-00-710-001).
 Subtask 31-10-00-710-055
 F. Test Program after Removal/Installation of the Panel 21VU
 (1)
 Do the operational test of the passenger entertainment (video) (Ref. TASK 23-36-00-710-001).

 (2)
 Do the operational test of the mechanic call (Ref. TASK 23-42-00-710-001).

 (3)
 Do the operational test of the CVR (Ref. TASK 23-71-00-710-001).


 1EFF : ALL 1 31-10-00Page 206 1 1 May 01/03R 1 1 1CES 1


 (4)
 Do the operational test of the cabin and flight crew interphone-system (Ref. TASK 23-73-00-710-003).

 (5)
 Do the operational test of the emergency evacuation (EVAC) signalling system (Ref. TASK 23-73-00-710-004).

 (6)
 Do the operational test of the battery-bus powered passenger-address system (Ref. TASK 23-73-00-710-006).

 (7)
 Do the operational test of the cabin and flight crew interphone-system (Ref. TASK 23-73-00-710-021).

 (8)
 Do the operational test of the emergency evacuation (EVAC) signalling system (Ref. TASK 23-73-00-710-026).

 (9)
 Do the operational test of the Generator Line Contactor (GLC-1) opening in the smoke procedure (Ref. TASK 24-22-00-710-001).


 (10)
 Do the operational test of the emergency generation system (Ref. TASK 24-24-00-710-001).

 (11)
 Do the inspection/check of the operation of the windshield wipers (Ref. TASK 30-45-00-200-001).

 (12)
 Do the functional test of the windshield rain protection (Ref. TASK 30-45-00-720-001).

 (13)
 Do the operational test of the GPWS ground self-test function (Ref. TASK 34-48-00-710-001).

 (14)
 Do the operational test of the crew oxygen distribution (Ref. TASK 35-12-00-710-001).

 (15)
 Do the operational test of manual mask release (Ref. TASK 35-23-00-710-001).


 Subtask 31-10-00-710-056 R G. Test Program after Removal/Installation of the Panel 22VU
 