(2)
Do the operational test of the override function (BLOWER and EXTRACT) (Ref. TASK 21-26-00-710-002).
1EFF : ALL 1 31-10-00Page 207 1 1 Feb 01/03 1 1 1CES 1
(3)
Do the operational test of the avionics-equipment ground-cooling
fault warning (Ref. TASK 21-27-00-710-001).
(4)
Do the operational test of the FWD cargo-compartment heating system (Ref. TASK 21-43-00-710-002).
(5)
Do the operational test of the landscape camera (Ref. TASK 23-36-00-710-002).
(6)
Do the operational test of the cargo-compartment smoke-detection
system by PTT (Ref. TASK 26-16-00-710-001).
(7)
Do the operational test of the cargo-compartment smoke-detection with the CFDS to confirm isolation valve latching circuit integrity (Ref. TASK 26-16-00-710-003).
(8)
Do the operational test of the ground cooling isolation valve to verify closing in case of smoke warning (Ref. TASK 26-16-00-710-008).
(9)
Do the operational test of the cargo-compartment fire-extinguishing system. (Ref. TASK 26-23-00-710-001).
(10)
Do a check of the firing circuit continuity and do the operational test of priority switching (Ref. TASK 26-23-00-710-003).
(11)
Do the functional test of time delay for illumination of "DISCH AGENT 2" reminder light (Ref. TASK 26-23-00-710-004).
(12)
Do a continuity check of the cargo-compartment firing-circuit (Ref. TASK 26-23-00-720-001).
(13)
Do the inspection/check of the operation of the windshield wipers (Ref. TASK 30-45-00-200-001).
(14)
Do the functional test of the windshield rain protection (Ref. TASK 30-45-00-720-001).
(15)
Do the functional test of the Electronic Control Unit (ECU) (Ref. TASK 73-21-60-720-040).
1EFF : ALL 1 31-10-00Page 208 1 1 Feb 01/03R 1 1 1CES 1
Subtask 31-10-00-710-057 R H. Test Program after Removal/Installation of the Panel 23VU
(1)
Do the operational test of the computers engagement/disengagement (Ref. TASK 27-96-00-710-002).
(2)
Do the operational test of the automatic change-over function (Ref. TASK 22-60-00-710-002).
Subtask 31-10-00-710-058 R J. Test Program after Removal/Installation of the Panel 24VU
(1)
Do the operational test of the computers engagement/disengagement (Ref. TASK 27-96-00-710-002).
(2)
Do the operational test of the automatic change-over function (Ref. TASK 22-60-00-710-002).
Subtask 31-10-00-710-059 R K. Test Program after Removal/Installation of the Panel 25VU
(1)
Do the operational test of the general illumination (Ref. TASK 33-12-00-710-001).
(2)
Do the operational test of the manual pressure control and monitoring (Ref. TASK 21-31-00-710-003).
(3)
Do the operational test of the outflow valve closing in ditching configuration (Ref. TASK 21-31-00-710-004).
(4)
Do the operational test of the cabin signs (only the test of the passengers lighted signs Para. 4.A.) (Ref. TASK 23-73-00-710-017).
(5)
Do the operational test of the wing ice-protection system (Ref. TASK 30-11-00-710-001).
(6)
Do the operational test of the windshield anti-icing and defogging (Ref. TASK 30-42-00-710-001).
(7)
Do an inspection/check of the operation of the windshield wipers (Ref. TASK 30-45-00-200-001).
(8)
Do the operational test of the annunciator light test system in the cockpit (Ref. TASK 33-14-00-710-001).
1EFF : ALL 1 31-10-00Page 209 1 1 Feb 01/03 1 1 1CES 1
(9) Do the operational test of the navigation lights (Ref. TASK 33-41-00-710-001).
(10)
Do the operational test of the landing lights (Ref. TASK 33-42-00-710-001).
(11)
Do the operational test of the runway turnoff lights (Ref. TASK 33-43-00-710-001).
(12)
Do the operational test of the taxi and take off lights (Ref. TASK 33-46-00-710-001).
(13)
Do the operational test of the logo lights (Ref. TASK 33-47-00-710-002).
(14)
Do the operational test of the anti-collision/strobe lighting (Ref. TASK 33-48-00-710-001).
(15)
Do the operational test of the anti-collision/strobe lighting (Ref. TASK 33-48-00-710-002).
(16)
Do the operational test of the wing and engine scan lights (Ref. TASK 33-49-00-710-001).
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 指示/记录系统INDICATING/RECORDING SYSTE(72)