• 热门标签

当前位置: 主页 > 航空资料 > 飞行资料 >

时间:2010-11-20 16:54来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

PROCEDURES
ABNORMAL AND EMERGENCY PROCEDURES
ICE AND RAIN PROTECTION
A318/A319/A320/A321 FLEET PRO-ABN-30 P 68/82
FCOM 19 AUG 10
ANTI ICE F/O + STBY PITOT
Applicable to:
L2 F/O and STBY pitot heating is lost. In case of simultaneous pitot icing and in the same amount,
ADR 2 and ADR 3 speeds will be in agreement, but incorrect. Therefore, flight controls will consider
the remaining correct source as being faulty, and will reject the only correct source. The following
ECAM procedure avoids that the flight controls use 2 erroneous, but coherent, sources.
L1 If ADR 1 operative and ON:
ADR 2 (3)..............................................................................................................................OFF
L2 Depending on the status of the static, AOA, and TAT heating, the ECAM requires that either
ADR 2 or 3 be switched OFF.
Note: In case of subsequent, significant, speed discrepancy between the 2 remaining ADRs,
the “ADR DISAGREE” ECAM caution will be triggered.
L1 If ADR 1 failed or OFF:
L2No action is required, as long as there are no icing conditions, in order to keep 2 independent
speed sources.
L1 IF ICING EXPECTED:
ADR 2 (3)......................................................................................................................... OFF
L2 Depending on the status of the static, AOA, and TAT heating, the ECAM requires that
either ADR 2 or 3 be switched OFF.
L1UNREL SPD PROC.....................................................................................................APPLY
L2 Only one ADR is available, and the corresponding pitot probe may be affected by ice
accretion. Be prepared to use the UNRELIABLE SPEED INDICATION/ADR CHECK PROC
procedure.
L1
ASSOCIATED PROCEDURES
NAV ADR FAULT
To be continued on next page
A318/A319/A320/A321 FLIGHT CREW
OPERATING MANUAL
PROCEDURES
ABNORMAL AND EMERGENCY PROCEDURES
ICE AND RAIN PROTECTION
A318/A319/A320/A321 FLEET PRO-ABN-30 P 69/82
FCOM 19 AUG 10
ANTI ICE F/O + STBY PITOT (Cont'd)
STATUS
 If ADR 1 failed or OFF:
 IF ICING EXPECTED:
ADR 2 (3)................................................................... OFF
UNREL SPD PROC...............................................APPLY
INOP SYS
F/O PITOT
STBY PITOT
F/O PROBES (1)
STBY PROBES (2)
(1) (If all F/O PROBES heating is lost)
(2) (If all STBY PROBES heating is lost)
A318/A319/A320/A321 FLIGHT CREW
OPERATING MANUAL
PROCEDURES
ABNORMAL AND EMERGENCY PROCEDURES
ICE AND RAIN PROTECTION
A318/A319/A320/A321 FLEET PRO-ABN-30 P 70/82
FCOM 19 AUG 10
ANTI ICE F/O + STBY PITOT
Applicable to: , , MSN
L2 F/O and STBY pitot heating is lost. In case of simultaneous pitot icing and in the same amount,
ADR 2 and ADR 3 speeds will be in agreement, but incorrect. Therefore, flight controls will consider
the remaining correct source as being faulty, and will reject the only correct source. The following
ECAM procedure avoids that the flight controls use 2 erroneous, but coherent, sources.
L1 If ADR 1 operative and ON:
ADR 2 (3) P/B........................................................................................................................ OFF
L2 Depending on the status of the static, AOA, and TAT heating, the ECAM requires that either
ADR 2 or 3 be switched OFF.
Note: In case of subsequent, significant, speed discrepancy between the 2 remaining ADRs,
the “ADR DISAGREE” ECAM caution will be triggered.
L1 If ADR 1 failed or OFF:
L2No action is required, as long as there are no icing conditions, in order to keep 2 independent
speed sources.
L1 IF ICING EXPECTED:
ADR 2 (3) P/B..................................................................................................................OFF
L2 Depending on the status of the static, AOA, and TAT heating, the ECAM requires that
either ADR 2 or 3 be switched OFF.
L1UNREL SPD PROC.....................................................................................................APPLY
L2 Only one ADR is available, and the corresponding pitot probe may be affected by ice
accretion. Be prepared to use the UNRELIABLE SPEED INDICATION/ADR CHECK PROC
procedure.
L1
ASSOCIATED PROCEDURES
NAV ADR FAULT
To be continued on next page
A318/A319/A320/A321 FLIGHT CREW
OPERATING MANUAL
PROCEDURES
ABNORMAL AND EMERGENCY PROCEDURES
ICE AND RAIN PROTECTION
A318/A319/A320/A321 FLEET PRO-ABN-30 P 71/82
FCOM 19 AUG 10
ANTI ICE F/O + STBY PITOT (Cont'd)
STATUS
 If ADR 1 failed or OFF:
 IF ICING EXPECTED:
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320机组操作手册FLIGHT CREW OPERATING MANUAL 10(19)