ADAA
Validity : S / N 1 - 9999 20-TC (EA) Page 2 JUN 02
SUBJECT CHAPTER PAGE VALIDITY
METAL TREATMENT AND PROTECTION (Cont'd) 20-00-04 (BA)
I 5. SURFACE TREATMENT 208
A. General 208
B. Procedure to use alodine (TB13-002) 208
6. REAPPLICATION AND FOLLOW-UP OF ANTI-CORROSION
PROTECTION ON IN SERVICE AIRCRAFT 209
A. Reminders about anti-corrosion protection 209
B. Application and principle of anti-corrosion protection reinforcement 209
C. Recommended products 210
D. Characteristics of the recommended protection products 210
E. Operational instructions 211
F. Important remarks 213
G. Periodicity 214
MARKINGS AND INSCRIPTIONS POSITIONING 20-00-05 (BA) 201
MAINTENANCE PRACTICES 201
1. MARKING POSITIONING PROCEDURE 201
A. Storage conditions 201
B. Materials required for positioning of "DISA" and "BSB" transfers 201
C. Positioning of "BSB" transfers 202
D. Positioning of "DISA" transfers 204
E. Materials required for positioning of polycarbonate grey self-adhesives (POLY) or transparent tapes (ADH) 204
F. Positioning of polycarbonate grey self-adhesives or transparent tapes 204
FLUID FITTINGS
SERVICING
1. INSTALLATION OF A SWIVEL FITTING ON A BOSS
A. Tools and consumable materials
B. Procedure 20-00-06 (BA) 301
301 301 301 301 1 - 9999
CABLES AND PULLEYS 20-00-07 (BA) 201
MAINTENANCE PRACTICES 201
1. CHECK OF CABLES 201
A. Procedure 201
2. REMOVAL / INSTALLATION - CABLES 201
A. Tools and consumable materials 201
B. Removal of cables 201
C. Installation of cables 201
3. CHECK OF PULLEYS 201
A. Sight check 201
ADAA
Validity : S / N 1 - 9999
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:TB20 MAINTENANCE MANUAL 20 STANDARD PRACTICES AIRFRAME TB20飞机维护手册 20 标准施工机体(4)