• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-27 17:13来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
R No specific blanking plugs
R  No specific caps No specific warning notice No specific Torque Wrench : range 36.00 to 220.00 lbf.in
 (0.40 to 2.60 m.daN)
 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. CP2101 USA MIL-T-5544
 graphite grease (Ref. 70-30-00) R Material No. CP2544 * R Molykote P37 (Ref. 70-30-00)
 Material No. CP8001 *
 lockwire 0.032 in (0.8 mm) dia (Ref. 70-30-00)
 Material No. CP8002 *
 lockwire 0.032 in (0.8 mm) dia (Ref. 70-30-00)

 F 『 EEFF : ALL E Page 47377-21-10
 E E Aug 01/04 E E ECES E

 F 『
 E C F M E
 E E
 E 56-5B E
 E E
 C. Referenced Information

 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
71-13-00-010-040 Opening of the Fan Cowl Doors 71-13-00-410-040 Closing of the Fan Cowl Doors 73-29-00-710-040 Operational Test of the FADEC on the Ground (with
 Engine Non motoring)
 78-30-00-081-041 Make the Thrust Reverser Serviceable after
 Maintenance
 78-30-00-481-041 Make the Thrust Reverser Unserviceable for

 Maintenance
 78-36-00-010-040 Opening of the Thrust Reverser Doors
 78-36-00-410-040 Closing of the Thrust Reverser Doors

R 77-21-10-991-309 Fig. 407
 3. Job Set-up
__________
 Subtask 77-21-10-860-063
 A. Aircraft Maintenance Configuration
 (1) On the center pedestal, on the ENG panel 115VU, make sure that a warning notice is in position to tell persons not to start the engine.

 (2) On the overhead maintenance panel 50VU, make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off. Make sure that a warning notice is in position to tell persons not to energize the FADEC 1(2).


 Subtask 77-21-10-010-093
 B. Get Access
 (1) Make sure that the fan cowl doors are open: (Ref. TASK 71-13-00-010-040) FOR 1000EM1 437AL, 438AR FOR 1000EM2 447AL, 448AR
 F 『 EEFF : ALL E Page 47477-21-10
 E E Aug 01/04 E E ECES E

 F 『
 E C F M E
 E E
 E 56-5B E
 E E
 (2) Make sure that the thrust reverser doors are open: (Ref. TASK 78-36-00-010-040) FOR 1000EM1 451AL, 452AR FOR 1000EM2 461AL, 462AR

 Subtask 77-21-10-040-077
 C. Make sure that the thrust reverser is unserviceable (Ref. TASK 78-30-00-481-041).
 4. Procedure
_________
R (Ref. Fig. 407/TASK 77-21-10-991-309)
 Subtask 77-21-10-420-063
R A. Installation of the Lower Right Thermocouple Lead Assembly (Lower Right R T495 Sector)
R (1) Remove blanking plugs and caps.
R (2) Lubricate the threads of the LPT case studs (30) with Molykote P37 R (Material No. CP2544).
R (3) Lubricate the threads of the bolts (60), (70), (120) with graphite grease (Material No. CP2101).
R (4) Carefully install the lower right T495 sector (20) in position on the R engine, and engage the lower right T495 sector probes in the LPT R case.
R (5) Install the parts which attach the upper right T495 sector as R follows:
 F 『 EEFF : ALL E Page 47577-21-10
 E E Aug 01/04 E E ECES E

 F 『
 E C F M E
 E E
 E 56-5B E
 E E
R -------------------------------------------------------------------------------R INSTALL | ON | NOTE R | | R Nuts (10) | Studs (30) | On LPT case, at the 4:15 and the 5:30 R | | o'clock positions (Detail B) R | | R Clamp (50) | Bracket (40) | On flange S, at the 6 o'clock position R | | (Detail C) R | | R Bolt (60) | | R Bolts (70) | Flange S | At the 5:15 o'clock position (Detail D) R | | R Nuts (90) | | R Clamp (110) | Bracket (100) | On flange S, at the 4:30 o'clock position R | | (Detail E) R Bolt (120) | |

R (6) TORQUE the nuts (10), (90) to between 100 and 110 lbf.in (1.13 and
 1.24 m.daN).
R (7) TORQUE the bolts (60), (120) to between 47 and 53 lbf.in (0.53 and R 0.59 m.daN).
R (8) Make sure that the connectors and receptacles are clean and clear of R unwanted materials.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM ENGINE INDICATING 发动机指示(31)