• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-27 17:07来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

No specific blanking caps
 No specific warning notice
 B. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
71-13-00-010-040 Opening of the Fan Cowl Doors
R 75-31-20-820-001 Set the Variable Bleed Valve Assembly to the Closed
R position 78-30-00-481-041 Make the Thrust Reverser Unserviceable for Maintenance 78-36-00-010-040 Opening of the Thrust Reverser Doors 75-31-70-991-300 Fig. 401 75-31-70-991-310 Fig. 402
 3. Job Set-up
__________
 Subtask 75-31-70-941-051
 A. Safety Precautions
 (1) On the center pedestal, on the ENG panel 115VU:
 (a) Put a warning notice to tell persons not to start the engine.
 F 『 EEFF : ALL E Page 40175-31-70
 E E Feb 01/99 E E ECES E

 F 『
 E C F M E
 E E
 E 56-5B E
 E E
 (2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.

 (3) On the overhead maintenance panel 50VU:
 (a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.

 (b) Put a warning notice to tell persons not to energize the FADEC 1(2).


 Subtask 75-31-70-010-053
 B. Get Access
 (1) Open the fan cowl doors: (Ref. TASK 71-13-00-010-040) FOR 1000EM1 437AL, 438AR FOR 1000EM2 447AL, 448AR
 Subtask 75-31-70-040-052
 C. Make the thrust reverser unserviceable (Ref. TASK 78-30-00-481-041). Subtask 75-31-70-010-054
 D. Open the thrust reverser doors: (Ref. TASK 78-36-00-010-040)
 FOR 1000EM1
 451AL, 452AR
 FOR 1000EM2
 461AL, 462AR

 4. Procedure
_________
 Subtask 75-31-70-820-051

 A. Make sure the two reference marks are in line. If not, set the VBV system R to closed position (Ref. TASK 75-31-20-820-001).
 Subtask 75-31-70-020-051
 B. Disconnect the 2 electrical cables
 PRE SB CFM 75-006
 (Ref. Fig. 401/TASK 75-31-70-991-300)

 F 『 EEFF : ALL E Page 40275-31-70
 E E Aug 01/00 E E ECES E F 『 E C F M E E E E 56-5B E F 『 E C F M E E E E 56-5B E E E POST SB CFM 75-006

 

 VBV Feedback Sensor - PRE SB CFM 75-006 Figure 401/TASK 75-31-70-991-300
 F EEFF : E ER ECES  ALL  『E 75-31-70EE E Page 403 Feb 01/99

 

 (Ref. Fig. 402/TASK 75-31-70-991-310)
 END OF SB CFM 75-006
 (1) Put blanking caps on the disconnected electrical connectors.

 (2) Remove the nut (30) and the pin (60) which secures the feedback rod clevis (20) to VBV sensor arm.


 NOTE : Do not loosen nut (10) securing clevis (20) to feedback rod.
____
 PRE SB CFM 75-006

 (3) Remove the 3 bolts (50) which secure the VBV sensor (40) to stop mechanism and remove the sensor.

 POST SB CFM 75-006

 (4) Remove the 3 bolts (50) and (55) which secure the VBV sensor (40) to stop mechanism and remove the sensor.


 END OF SB CFM 75-006
 F 『 EEFF : ALL E Page 40475-31-70
 E E Feb 01/99 ERE
ECES E F 『 E C F M E E E E 56-5B E

 

R R  VBV Feedback Sensor - POST SB CFM 75-006 Figure 402/TASK 75-31-70-991-310
 F EEFF : E E ECES  ALL  『E 75-31-70EEE Page 405 May 01/98


 F 『
 E C F M E
 E E
 E 56-5B E
 E E


 TASK 75-31-70-400-002
 Installation of the Variable Bleed Valve position Sensor
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific warning notice
R No specific Torque Wrench : range 5.00 to 35.00 lbf.in
R (0.05 to 0.40 m.daN) No specific Torque Wrench : range 36.00 to 220.00 lbf.in
 (0.40 to 2.60 m.daN)
 B. Consumable Materials
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
Material No.  CP1039 
R  Material No.  CP2011 

Material No.  CP2101 
Material No.  CP2338 
R  Material No.  CP2559 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR 空气(61)