• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-27 17:07来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 Removal of a VBV Inter-connecting Flexible Shaft (Typical).
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific warning notice
 No specific access platform 1 m (3 ft. 3 in.)
 B. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
71-13-00-010-040 Opening of the Fan Cowl Doors
 72-23-00-000-027 Removal of the Fan Duct Panels
R 75-31-20-820-001 Set the Variable Bleed Valve Assembly to the Closed
R position 78-30-00-481-041 Make the Thrust Reverser Unserviceable for Maintenance 78-36-00-010-040 Opening of the Thrust Reverser Doors 75-31-30-991-300 Fig. 401
 3. Job Set-up
__________
 Subtask 75-31-30-941-052
 A. Safety Precautions
 (1) On the center pedestal, on the ENG panel 115VU:
 (a) Put a warning notice to tell persons not to start the engine.
 F 『 EEFF : ALL E Page 40175-31-30
 E E Aug 01/00 E E ECES E

 F 『
 E C F M E
 E E
 E 56-5B E
 E E
 (2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.

 (3) On the overhead maintenance panel 50VU:
 (a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.

 (b) Put a warning notice to tell persons not to energize the FADEC 1(2).


 Subtask 75-31-30-010-056
 B. Get Access
 (1) Open the fan cowl doors: (Ref. TASK 71-13-00-010-040) FOR 1000EM1 437AL, 438AR FOR 1000EM2 447AL, 448AR

 (2) Put the access platform in position.


 Subtask 75-31-30-040-054
 C. Make the thrust reverser unserviceable (Ref. TASK 78-30-00-481-041).
 Subtask 75-31-30-010-058
 D. Open the thrust reverser cowl doors: (Ref. TASK 78-36-00-010-040) FOR 1000EM1 451AL, 452AR FOR 1000EM2
R 461AL, 462AR.
 F 『 EEFF : ALL E Page 40275-31-30
 E E Feb 01/05 E E ECES E

 F  『
 E  C F M  E
 E  E


 E 56-5B E
 E E


 4. Procedure
_________
 (Ref. Fig. 401/TASK 75-31-30-991-300)
 Subtask 75-31-30-020-052

 A. Removal of a bleed valve inter-connecting flexible shaft
R  (1) Set the VBV system to the CLOSED position (Ref. TASK 75-31-20-820-001).
 (2) Remove fan duct panels, from each side of the fan frame strut related to the flexible shaft you want to remove (Ref. TASK 72-23-00-000-027).

 (3) Remove the flexible shafts as follows:

 (a) Push the flexible shaft clockwise to compress the spring and disengage the opposite end.

 (b) Remove the flexible shaft through the fan frame strut.

 


 F 『 EEFF : ALL E Page 40375-31-30
 E E Aug 01/00 E E ECES E F 『 E C F M E E E E 56-5B E

 

 VBV Inter-connecting Flexible Shaft (Typical)
 Figure 401/TASK 75-31-30-991-300
 F EEFF :  ALL  『E 75-31-30 Page 404 
E  E  Feb 01/98
 E  E
 ECES  E


 F 『
 E C F M E
 E E
 E 56-5B E
 E E


 TASK 75-31-30-400-001
 Installation of a VBV Inter-connecting Flexible Shaft (Typical)
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific warning notice
 No specific access platform 1 m (3 ft. 3 in.)
 B. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
71-13-00-010-040 Opening of the Fan Cowl Doors 71-13-00-410-040 Closing of the Fan Cowl Doors 72-23-00-400-027 Installation of the Fan Duct Panels 73-29-00-710-040 Operational Test of the FADEC on the Ground (with
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR 空气(50)