F 『
E C F M E
E E
E 56-5B E
E E
3. Job Set-up
__________
Subtask 75-21-10-941-052
A. Safety Precautions
(1) On the center pedestal, on the ENG panel 115VU:
(a) Put a warning notice to tell persons not to start the engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(3) On the overhead maintenance panel 50VU:
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put a warning notice to tell persons not to energize the FADEC 1(2).
Subtask 75-21-10-010-055
B. Get Access
(1) Open the fan cowls doors: (Ref. TASK 71-13-00-010-040)
FOR 1000EM1
437AL, 438AR
FOR 1000EM2
447AL, 448AR.
(2) Put the access platform in position.
Subtask 75-21-10-040-054
C. Make the thrust reverser unserviceable (Ref. TASK 78-30-00-481-041).
Subtask 75-21-10-010-056
D. Open Thrust reverser doors:(Ref. TASK 78-36-00-010-040)
FOR 1000EM1
451AL, 452AR
FOR 1000EM2
461AL, 462AR.
F 『 EEFF : ALL E Page 60275-21-10
E E Feb 01/98 E E ECES E
F 『
E C F M E
E E
E 56-5B E
E E
4. Procedure
_________
(Ref. Fig. 601/TASK 75-21-10-991-300)
Subtask 75-21-10-210-052
A. Do a visual inspection of the HPT active clearance control (HPTACC) valve as follows:
-------------------------------------------------------------------------------INSPECT/CHECK MAXIMUM REMARKS SERVICEABLE LIMITS -------------------------------------------------------------------------------
1. Valve housing for:
- cracks Not serviceable. Replace the valve (Ref. TASK 75-21-10-000-002) and (Ref. TASK 75-21-10-400-002).
- deformation Not serviceable. Replace the valve (Ref. TASK 75-21-10-000-002) and (Ref. TASK 75-21-10-400-002).
- nicks or scratches Any amount
2. Flanged joints for:
- loose bolts or nuts Not serviceable. TORQUE the bolts (Ref. TASK 75-21-10-400-002).
- cracks Not serviceable. Replace the valve (Ref. TASK 75-21-10-000-002) and (Ref. TASK 75-21-10-400-002)
- deformed or bent Not serviceable. Replace the valve (Ref. TASK 75-21-10-000-002) and (Ref. TASK 75-21-10-400-002).
R R PRE CFM SB 75-0012 R
F 『 EEFF : ALL E Page 60375-21-10
E E Aug 01/05 E E ECES E F 『 E C F M E E E E 56-5B E
High Pressure Turbine Active Clearance Control Valve Inspection
Figure 601/TASK 75-21-10-991-300- 12 (SHEET 1)
F 『 EEFF : ALL E Page 60475-21-10
E E Feb 01/98 E E ECES E F 『 E C F M E E E E 56-5B E
High Pressure Turbine Active Clearance Control Valve Inspection
Figure 601/TASK 75-21-10-991-300- 22 (SHEET 2)
F 『 EEFF : ALL E Page 60575-21-10
E E Feb 01/98 E E ECES E
F 『
E C F M E
E E
E 56-5B E
E E
-------------------------------------------------------------------------------INSPECT/CHECK MAXIMUM REMARKS SERVICEABLE LIMITS -------------------------------------------------------------------------------
R R 3. Ceramic Insulators for:
R R - Looseness Not serviceable
R R R END OF PRE CFM SB 75-0012
R R POST CFM SB 75-0012
R R R R R R 4. Ceramic Insulators for: - Not applicable END OF CFM SB 75-0012
Subtask 75-21-10-230-051
Remove the valve (Ref. TASK 75-21-10-400-002)
B. Do a fluorescent penetrant inspection to make sure of actual or suspected cracks in the valve housing or a flanged joint.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR 空气(14)