• 热门标签

当前位置: 主页 > 航空资料 > 国外资料 >

时间:2010-08-14 08:46来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

RFID Tag
RFID Antennae
Motion Sensors
RFID Reader
Error Light
PAC October 2007 Page 11
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document. Examples
RFID Tag
RFID Antennae
Motion Sensors
RFID Reader
Error Light
Scope
750 Material Delivery Units (MDUs) containers per A380
Automated life cycle tracking of MDUs from 3PL to FAL
BENEFITS and STATUS TODAY
Reduce containers by 8% compared to manual process
Pilot Phase Over – Now in Production, 3000 containers
40 RFID Readers Installed and Operational
PAC October 2007 Page 12
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document. Examples
BELUGA
Sheet Metal Tracking
FAL ground test tools
Tool handling
AS BUILT Configuration
Aircraft Attestation, CAIR, AIR
E.g. Yellow Labels
Pilots in Progress
Pilots being
prepared
PAC October 2007 Page 13
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document. Examples
Current process : parts exchange (not programmed)
Example
Actors
External
Engineering dpt
Stock
Mechanics
Logbook entry
Replacement part
identify and procure
Maintenance task :
Remove part as per AMM
Install part as per AMM
Functional test ok
Data capture :
Logbook filled in
Parts labelled with paper
Hand written information
Stock update
Work order validated
Data typed in MIS
Work order for repair preparation
Part send
in repair shop
Logbook entry taken
into account
TSM procedure applied
Current process : parts exchange (not programmed)
Example
MIS
Config mgt IS
Aircraft A/L offices
1 Log-book entry
2
3 4
5
8
7
10
Faulty part
􀀱 􀀱
Line mechanics look after
parts in warehouse.
Check for interchangeability
Maintenance takes place Check out the parts
-Faulty parts removed
-New parts installed
-Tests OK
-Logbook & paperwork filling (with parts
ID & reasons for removal, etc.) and
signature
Mechanics type logbook
data in MIS
Engineering prepare work
order for repair shop
Repair shop
􀀱
􀀱
􀀱
􀀱
􀀱
􀀱
9
Line mechanics do the
diagnostic (according to TSM)
Get the faulty parts P/Ns 􀀱
6
Proposed process : parts exchange
Example
MIS
Config mgt IS
Aircraft A/L offices
1 Log-book entry
2
3 4
5
7
8
Faulty part
􀀱
Line mechanics look after
parts in warehouse.
Check for interchangeability
Maintenance takes place Check out the parts
-Faulty parts removed
-New parts installed
-Tests OK
-Direct update of on-board & ground
data base & logbook filling
Engineering prepare work
order for repair shop
Repair shop
􀀱
􀀱
Line mechanics do the
diagnostic (according to TSM)
Get the faulty parts P/Ns
6
Proposed process : parts exchange (not programmed)
Example
Actors
External
Engineering dpt
Stock
Mechanics
Logbook entry
Replacement part
identify and procure
Maintenance task :
Remove part as per AMM
Install part as per AMM
Functional test ok
Data capture :
Logbook filled in
thanks to tags data
Stock automatically updated
Tags updated
Work order for repair prepared
Part send in
repair shop
Logbook entry taken
into account
TSM procedure applied
PAC October 2007 Page 14
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document. Questions still to be answered
• Tags
􀀗Durability and environment protection
􀀗Memory size and management
􀀗Form factor
􀀗Price & supply sources
• Readers
􀀗Worldwide compatibility (e.g. UHF)
􀀗Airworthiness & safety
• Security
􀀗Data integrity schemes
• Integration
􀀗Legacy & RFID specific
􀀗Databases synchronisation
PAC October 2007 Page 15
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
© AIRBUS S.A.S. All rights reserved. Confidential and
proprietary document.
This document and all information contained herein is the sole
property of AIRBUS S.A.S.. No intellectual property rights are
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:航空资料12(5)