曝光台 注意防骗
网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
Tracking Reliability Aircraft Census (TRAC)
Reliability Analysts TRAC / SAS
Statistical System Engineering Report
Lab. Report
Service Center Report
Shop Report
Tear Down Report
UR Notification
Warranty claim
CMS Report
Contact Reports
OEM Reports
Operator Reports
Document
storage
Automated data feed
TRAC
database
Reporting
Shops, OEMs, FMP
manual data feed
Census, reliability, configuration
Data extraction for analysis & decision making
Reporting of issues, trends, reliability rates, etc.
to Aviation Authorities, OEMs, & Operators.
DATA ACTIVITY
72,800,000 Data points
690,600 Engine records
146,678 Aircraft records
185 Unique fields
P&WC PROPRIETARY INFORMATION 27
MANAGING FLEET SAFETY
Screening Criteria and Procedures Standardized
Multiple Filtering of In-Service and Overhaul findings
Statistically Based Assessments
Utilize Industry-Accepted Practices (FAA / TCCA approved)
Evaluate Unmitigated Risk and Corrective Action impacts
Mitigate Risk through Fleet Campaign Plans
Safety Review Prior to Release External to P&WC
Engine Safety Criteria Appropriate to Type of Flight Operations
Offshore / CAT A
General Aviation
Single Engine
Regional / Civil Transport
P&WC PROPRIETARY INFORMATION 28
Control System Benefits
Full-Authority Digital Electronic Control system (FADEC)
Reduced pilot workload
Enhanced dispatch reliability
Pilot training mode – OEI (twin engines application)
Automated starting with over temperature protection
Variable Nr governing
Automatic limiting
Power sharing
State-Of-Art Diagnostics / Prognostics
Engine run time
Fractional cycle counting
Creep count
Engine Fault Code, Exceedance and Event monitoring
Engine Performance
HUMS capability
Preventative Maintenance
Flexible State of Art Diagnostics & Prognostics for HUMS
Operator
OEM
PWC
FADEC HUMS
AC Systems
Dedicated Website
ECTM Files
Fault Codes
Transient Data
GBS Output
P&WC
OEM
Local Cell Phone Network
Smart Software
Internet
DTU
AC Systems
P&WC Product Initiatives
CONTROLS / DIAGNOSTICS & PROGNOSTICS
P&WC PROPRIETARY INFORMATION 29
Transport Canada
SMS Requirements
6 Components
17 Elements
1. Safety Management Plan
1.1 Safety Policy
1.2 Non-punitive SMS disciplinary policy
1.3 Roles, Responsibilities & Employee Involvement
1.4 Communication
1.5 Safety Planning, Objectives & Goals
1.6 Performance Measurement
1.7 Management Review
2. Document Management
2.1 Identification & Maintenance of Applicable
Regulations
2.2 SMS Documentation
2.3 Records Management
6. Emergency Preparedness
5. Quality Assurance
4. Training
3. Safety Oversight
3.1 Reactive Processes
3.2 Proactive Processes
3.3 Investigation and Analysis
3.4 Risk Management
CAR 106 – Accountable Exec
CAR 107 – SMS Reqirements
P&WC PROPRIETARY INFORMATION 30
P&WC SMS Implementation
Communication
General SMS awareness via PWC website and publications
Teams involved in two day SMS Gap analysis workshops
SMS Communication Plan under further development as part of SMS
Implementation plan
Training (SMS Component 4)
SMS Module now part of 3 day Airworthiness and Certification
Training
Human Factors Training part of CAR / STD 573 Requirement for AMO
SMS Training requirements by certificate to be further developed &
delivered per SMS Implementation plan
(SMS Element 1.4)
P&WC PROPRIETARY INFORMATION 31
Consolidate & Develop Procedures
2008 2009 2010 2011 2012
SMS Manual
AE Commit Statement
Safety Policy Revised
Implement Plan (All phases for all certificates)
Gap Analysis
SMS Board & Steering Group Oversight
Reg in force
Feb 2010
AMO
Phase I
Feb 2011
AMO
Phase II
Feb 2012
AMO
Phase III
Feb 2013
AMO
Phase IV
Dec 2010
Reg in force
Manufacturing
Phase I
Nov 2011
Reg in force
Certification
Phase I
Develop Plan
TCCA SMS Implementation dates
Regular meetings with TCCA
to update SMS progress
P&WC PROPRIETARY INFORMATION 32
Gap Analysis & Implementation Plan
All required SMS elements reviewed
Specific cross certificate teams to be formed to address
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:
航空资料12(2)