• 热门标签

当前位置: 主页 > 航空资料 >

时间:2010-07-26 01:11来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

无 Nil
ZSYT AD 2.21 减噪程序 ZSYT AD 2.21 Noise abatement procedures
无 Nil
ZSYT AD 2.22 飞行程序
ZSYT AD 2.22 Flight procedures
1. 总则 1. General
除经塔台特殊许可外,在塔台管制区内的
飞行,必须按照仪表飞行规则进行。
Flights within Tower Control Area shall operate under IFR unless
special clearance has been obtained from Tower Control.
2. 起落航线 2. Traffic circuits
起落航线在跑道东侧,C、D 类航空器高
500 米,A、B 类航空器高400 米,仪表飞行
时,五边改出不要偏西,并听从ATC 指挥。
Traffic circuits shall be made to the east of RWY, at the height of
500m for aircraft CAT C/D, and 400m for aircraft CAT A/B. When
operating under IFR, deviation westwards is forbidden on final
approach, and ATC instructions shall be complied with.
3. 塔台管制区内的仪表飞行程序 3. IFR flight procedures within Tower Control Area
严格按照航图中公布的进、离场程序飞
行。如果需要,航空器可在空中交通管制部门
指定的航路、导航台或定位点上空等待或做机
动飞行。
Strict adherence is required to the relevant arrival/departure
procedures published in the aeronautical charts. Aircraft may, if
necessary, hold or maneuver on an airway, over a navigation
facility or a fix designated by ATC.
4. 雷达程序 4. Radar procedures

Nil
5. 无线电通信失效程序 5. Radio communication failure procedures

Nil
6. 目视飞行程序 6. Procedures for VFR flights

Nil
2002-10-1
中国航行资料汇编 AIP CHINA
中国民用航空总局 CAAC
ZSYT AD 2-10
7. 目视飞行航线 7. VFR route

Nil
8. 目视参考点 8. Visual reference point

Nil
9. 其它规定 9. Other regulations

Nil
ZSYT AD 2.23 其它资料 ZSYT AD 2.23 Other information

Nil
2002-10-1
ZBAA BEIJING
YANTAI/Laishan ZSYT
AERODROME CHART-1
STANDARD DEPARTURE CHARTINSTRUMENT(
RWY04)-7A
STANDARD DEPARTURE CHARTINSTRUMENT(
RWY22)-7B
STANDARD ARRIVAL CHART-INSTRUMENT
(RWY04)-9A
STANDARD ARRIVAL CHART-INSTRUMENT
(RWY22)-9B
INSTRUMENT APPROACH CHART-ICAO (ILS/
DME RWY04)-10A
INSTRUMENT APPROACH CHART-ICAO(ILS/
DME RWY22)-10B
INSTRUMENT APPROACH CHART-ICAO(VOR/
DME RWY04)-10C
INSTRUMENT APPROACH CHART-ICAO(VOR/
DME RWY22)-10D
file:///J|/manual/study/CAIP中国航行资料汇编/ad/ZSYT/ZSYT_INDEX.htm[2010-07-26 0:42:09]

 

 

 

 

contents
CHONGQING/
Jiangbei ZUCK
AERODROME CHART-1
AIRCRAFT-PARKING CHART-ICAO-2
AERODROME OBSTRUCTION
CHART-ICAO-4
STANDARD DEPARTURE
CHART-INSTRUMENT(RWY02)-7A
STANDARD DEPARTURE
CHART-INSTRUMENT(RWY20)-7B
STANDARD ARRIVAL
CHART-INSTRUMENT(RWY02)-9A
STANDARD ARRIVAL
CHART-INSTRUMENT(RWY20)-9B
INSTRUMENT APPROACH CHARTICAO(
ILS/DME RWY02)-10A
INSTRUMENT APPROACH CHARTICAO(
ILS/DME RWY20)-10B
INSTRUMENT APPROACH CHARTICAO(
VOR/DME RWY02)-10C
INSTRUMENT APPROACH CHARTICAO(
VOR/DME RWY20)-10D
INSTRUMENT APPROACH CHARTICAO(
NDB/DME RWY 02)-10E
INSTRUMENT APPROACH CHARTICAO(
NDB/DME RWY20)-10F
􀣪􀝖􀌍􀑞 PDF 􀋖􀎁􀁤请单击here<
file:///J|/manual/study/CAIP中国航行资料汇编/ad/ZUCK/ZUCK.htm[2010-07-26 0:42:16]
中国航行资料汇编 AIP CHINA
中国民用航空总局CAAC
ZUCK AD 2-1
ZUCK AD 2.1 机场地名代码和名称Aerodrome location indicator and name
ZUCK—重庆/江北 CHONGQING/Jiangbei
ZUCK AD 2.2 机场地理位置和管理资料 Aerodrome geographical and administrative data
1
机场基准点坐标及其在机场的位置
ARP coordinates and site at AD
N29° 43.0' E106° 38.4'
Center of RWY
2
方向、距离
Direction and distance from city 018° GEO, 19km from city center square
3
标高/参考气温
Elevation/Reference temperature 416m/ 31.5° C (AUG)
4
磁差/年变率
MAG VAR/Annual change 2° W/ -
5
机场管理部门、地址、电话、传真、AFS
AD administration, address, telephone, telefax,
AFS
Chongqing Municipal Administration of CAAC
Chongqing Jiangbei International Airport, Chongqing 401120, China
TEL: 86-23-67856434 FAX: 86-23-67823175
AFS: ZUCKYDYX
6
允许飞行种类
Types of traffic permitted(IFR/VFR) IFR/VFR
7
备注
Remarks Nil
ZUCK AD 2.3 工作时间 Operational hours
1
机场当局(机场开放时间)
AD Administration(AD operational hours) H24
2
海关和移民
Customs and immigration H24 (2 HR PN required for urgent cargo)
3
卫生健康部门
Health and sanitation H24
4
航行情报服务讲解室
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:CAIP中国航行资料汇编4(57)