• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-20 08:03来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (a)  
Supply external power to the ac ground handling bus
 (AMM 24-22-00/201).


 (b)  
Push the BAT switch on the pilot's overhead panel, P5, to the ON position (latched-in position).

 (c)  
Make sure the left BUS TIE switch on the P5 panel is off (out position). 1) Make sure the yellow ISLN light in the switch is on.

 (d)  
Push the EXT PWR switch on the P5 panel. 1) Make sure the white ON light in the switch comes on.

 (e)  
Push the left BUS TIE switch to the AUTO position (latched-in position). 1) Make use the yellow left BUS OFF light on the P5 panel goes

 off.

 (f)  
Push the left BUS TIE switch to off (out position). 1) Make sure the amber ISLN light in the switch is on.

 (g)  
Push the RESET button on the bus power control unit (BPCU). (The BPCU is on shelf 3 of the mid equipment center rack E5.) 1) Make sure these messages show on the BPCU, in the sequence

 that follows:
 a) EXTERNAL POWER SYSTEM
 b) LEFT GEN POWER SYSTEM
 c) RIGHT GEN POWER SYSTEM
 d) APU GEN POWER SYSTEM.


 (h)  
Remove electrical power if it is not necessary.


 S 714-008
 (3)  Do the steps that follow to do a test of the right generator control unit:
 (a)  Supply external power to the ac ground handling bus
 (AMM 24-22-00/201).

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 24-22-02
 ALL  ú ú 01 Page 403 ú Sep 28/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

757
MAINTENANCE MANUAL

 (b)  
Push the BAT switch on the pilot's overhead panel, P5, to the ON position (latched-in position).

 (c)  
Make sure the right BUS TIE switch on the P5 panel is off (out position). 1) Make sure the yellow ISLN Light in switch is on.

 (d)  
Push the EXT PWR switch on the P5 panel. 1) Make sure the white ON light in the switch comes on.

 (e)  
Push the BUS TIE switch to the AUTO position (latched-in position). 1) Make sure the yellow right BUS OFF light on the P5 panel

 goes off.

 (f)  
Push the right BUS TIE switch to off (out position). 1) Make sure the yellow ISLN light in the switch is on.

 (g)  
Push the RESET button on the bus power control unit (BPCU). (The BPCU is on shelf 3 of the mid equipment center rack E5.) 1) Make sure these messages show on the BPCU, in the sequence

 that follows:
 a) EXTERNAL POWER SYSTEM
 b) LEFT GEN POWER SYSTEM
 c) RIGHT GEN POWER SYSTEM
 d) APU GEN POWER SYSTEM.


 (h)  
Remove electrical power if it is not necessary.


 S 714-009
 (4)  Do the steps that follow to do a test of the APU generator control unit:
 (a)  
Push the BAT switch on the P5 panel to the ON position (latched-in position).

 (b)  
Make sure the two BUS TIE switches on the P5 panel are off (out position). 1) Make sure the yellow ISLN light in each switch is on.

 (c)  
Push the APU GEN switch on the P5 panel to the ON position (latched-in position).

 (d)  
Start the APU (AMM 49-11-00/201).


 1)  Make sure the OFF light in the APU GEN switch on the P5 panel stays off.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 24-22-02
 ALL  ú ú 02 Page 404 ú May 28/99
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A

757
MAINTENANCE MANUAL

 (e)  
Push the APU GEN switch to off (out position). 1) Make sure the yellow OFF light in the APU GEN switch is on.

 (f)  
Stop the APU (AMM 49-11-00/201).

 (g)  
Push the RESET button on the bus power control unit (BPCU). (The BPCU is on shelf 3 of the mid equipment center rack E5.) 1) Make sure these messages show on the BPCU, in the sequence

 that follows:
 a) EXTERNAL POWER SYSTEM
 b) LEFT GEN POWER SYSTEM
 c) RIGHT GEN POWER SYSTEM
 d) APU GEN POWER SYSTEM.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:757 AMM 飞机维护手册 电源 ELECTRICAL POWER 1(86)