* SEE THE WDM EQUIPMENT LIST
Generator Drive System - Component Index
Figure 101
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
24-11-00
ALL ú
ú 01 Page 101
ú Mar 20/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
757
FAULT ISOLATION/MAINT MANUAL
FLIGHT COMPARTMENT
Generator Drive System - Component Location
Figure 102 (Sheet 1)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
24-11-00
ALL ú ú 01 Page 102 ú Mar 20/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
757
FAULT ISOLATION/MAINT MANUAL
FAN COWL 413AL 423AL
INTEGRATED DRIVE
GENERATOR IDG AIR/OIL HEAT EXCHANGER
SEE B SEE A
IDG AIR/OIL
HEAT EXCHANGER
FIREWALL
(REF)
IDG AIR/OIL HEAT EXCHANGER
A
QUICK
ATTACH/DETACH
COUPLING
ACCESSORY
GEARBOX (REF)
INTEGRATED
DRIVE
GENERATOR
INTEGRATED DRIVE GENERATOR
B
Component Location
Figure 102 (Sheet 2)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
24-11-00
ALL ú ú 01 Page 103 ú Mar 20/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
757 MAINTENANCE MANUAL
GENERATOR DRIVE SYSTEM - ADJUSTMENT/TEST
________________________________________
1. General_______
A. This procedure has these tasks:
(1)
The BITE and RESET Test
(2)
The Operational Test for the Left IDG
(3)
The Operational Test for the Right IDG
(4)
The Frequency Adjustment of the IDG
B. Do these tests after an IDG replacement.
C. If the spoilers are extended, and electrical power is removed, the spoilers will retract in less than one second.
TASK 24-11-00-745-001
2. The BITE and RESET Test_______________________
A. General
(1) This procedure does a check of the RESET operation and a BITE test with the bus power control unit (BPCU).
B. References
(1) AMM 24-22-00/201, Electrical Power - Control
C. Access
(1)
Location Zones
212 Flight Compartment (RH Side)
119/120 Main Equipment Center
(2)
Access Panels
119BL Main Equipment Center Panel
D. Prepare for the Test
S 865-047
(1) Supply electrical power to the 115V ac buses (AMM 24-22-00/201).
NOTE: The BPCU BITE procedure can be run with battery power.
____
E. Procedure
S 745-005
(1) Do the RESET check:
(a) Momentarily push the RESET switch on the front of the BPCU (E5-3).
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
24-11-00
ALL ú ú 01 Page 501 ú Jan 28/01
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:757 AMM 飞机维护手册 电源 ELECTRICAL POWER 1(12)