20-15-11
ALL ú ú 01 Page 216 ú Sep 28/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
757
MAINTENANCE MANUAL
S 742-039
(12) Make sure that the correct software part numbers are installed in the component.
NOTE: The software installation task for the component has the
____
steps to do a software configuration check.
S 862-046
(13) Remove electrical power (AMM 24-22-00/201).
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
20-15-11
ALL ú ú 01 Page 217 ú Sep 28/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
1.
2.
ú
ú
ú
A
757 MAINTENANCE MANUAL
CONTROL CABLES - INSPECTION/CHECK
_________________________________
General
_______
A. Use these procedures to verify the integrity of the control cable system. The procedures must be performed along the entire cable run in each system. To ensure verification of the portions of the cables that are in contact with pulleys and quadrants, the control cables must be moved by operation of the applicable system's controls, to expose those portions of the cables.
B. The first task is an inspection of the control cable wire rope.
C. The second task is an inspection of the control cable fittings.
D. The third task is an inspection of the pulleys.
E. These three tasks may be performed concurrently at one location of the cable system on the airplane if desired for convenience.
TASK 20-20-02-216-025
Inspection of the control cable wire rope.
____________________________________________
A. Examine the wire rope.
S 146-039
(1)
Clean the cables (as necessary) for the inspection (AMM
12-21-31/301).
S 226-026
(2)
Perform a detailed visual inspection to make sure that the cable does not contact parts other than pulleys, quadrants, cable seals or grommets installed to control the cable routing. The minimum cable clearance from other parts is 0.20 inches except 0.10 inches within 10 inches of a pulley or quadrant. Look for evidence of contact with other parts. Correct the condition if evidence of contact is found.
S 226-027
(3)
Perform a detailed visual inspection of the cable runs for incorrect routing, kinks in the wire rope, or other damage.
(a) Replace the cable assembly if:
1) The individual wires in each strand appear to blendtogether (outer wires worn 40 percent or more, refer toFig. 601).
2) If a kink is found.
3) If corrosion is found.
S 226-028
(4) Perform a detailed visual inspection of the cable. To do a check for broken wires, rub a cloth along the cable. The cloth will identify broken wires by catching on them.
(a) Replace the 7 x 7 cable assembly if: 1) There is two or more broken wires in 12 continuous inches of cable.
2) There is three or more broken wires anywhere in the total cable assembly.
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
20-20-02
ALL ú ú 01.1 Page 601 ú Sep 28/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
757 MAINTENANCE MANUAL
(b) Replace the 7 X 19 cable assembly if: 1) There is four or more broken wires in 12 continuous inches of cable.
2) There is six or more broken wires anywhere in the total cable assembly.
S 216-038
(5) Inspect the carbon steel control cable lubrication.
(a)
Make sure there is sufficient lubrication on the control cable.
(b)
If the lubrication is not sufficient, lubricate the control cable (AMM 12-21-31/301).
NOTE: Do not apply the grease or oil to stainless steel (CRES)
____
control cables.
TASK 20-20-02-216-029
3. Inspection of the control cable fittings.
___________________________________________
A. Examine the control cable fittings.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:757 AMM 飞机维护手册 STANDARD PRACTICES - AIRFRAME(97)