• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-15 08:32来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (d)  
Put a 5/16-inch hex wrench into the latch socket (Section D-D).

 (e)  
Push the hex wrench and turn it clockwise until the latch hook is tightly engaged in the latch eye bolt.

 (f)  
Repeat steps (d) and (e) for the five remaining latches.


 TASK 53-52-01-002-020
 4. Nose Radome Removal
___________________
 A. Special Tools and Equipment
 (1)  2OHME65B07930 Sling - Nose Radome Overhead Mechanical Equipment
 B. Standard Tools and Equipment
 (1)  Lift - Mobile Mechanical (or equivalent overhead crane)
 NOTE: The lift must extend to a height of 26 feet and lift 200
____
 pounds.

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 53-52-01
 ALL  ú ú 01 Page 205 ú Oct 18/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

 C. References
 (1)  IPC 53-52-04 Fig. 1
 D. Access
 (1)  Location Zone
 111 Radome

 E. Procedure
 S 012-006
 (1)  
Open the nose radome (Ref par. "Nose Radome Opening").

 S 492-007

 (2)  
Install the sling around the nose radome and attach the sling to the lift or crane (Fig. 202).

 S 022-008

 (3)  
Remove the nose radome:

 (a)  
Remove the cotter pin, nut and washers to disconnect the guide links (1 and 11) from the guide link fitting on the nose radome (Fig. 201, Detail C-C).

 (b)  
Disconnect the top and lower hinge arms from the hinge arm fittings on the nose radome: 1) Remove the cotter pin, nut and two washers (Fig. 201,

 


 Section B-B) from the top and lower hinge arm fittings. 2) Loosen the bolts through the cap without a key on the lower
 hinge arm. 3) Remove the cap (9) with a key (26) on the lower hinge arm. 4) Lift the lower hinge arm (10) along the torque tube (7) and
 remove the hinge arm from the stud on the hinge arm fitting (Section B-B). 5) Lift the nose radome to lift the stud out of the bearing on the top hinge arm.
 (c)  Remove the nose radome from the airplane.
 TASK 53-52-01-402-019
 5. Nose Radome Installation (Fig. 201)
________________________
 A. Special Tools and Equipment
 (1)  2OHME65B07930 Sling - Nose Radome Overhead Mechanical Equipment
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 53-52-01
 ALL  ú ú 01 Page 206 ú Oct 10/91
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

SLING
RADOME (REF)
Sling Installation
Figure 202

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 53-52-01
 ALL  ú ú 01 Page 207 ú Oct 10/88
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
 B.
C.
D.
E.
F.
A
747-400 MAINTENANCE MANUAL
Standard Tools and Equipment
 (1)  Lift - Mobile Mechanical (or equivalent overhead crane)
 NOTE:____ The lift must extend to a height of 26 feet and lift 200
 pounds.
 (2)  Meter - Bonding (Ref 20-22-01/601)

Consumable Materials
 (1)  
E00000 - Abrasive Paper

 (2)
G00000 - Putty or equivalant materialReferences

 (1)  
20-22-01/601, Electrical Bonding

 (2)  
53-52-01/701, Nose Radome

 (3)
IPC 53-52-04 Fig. 1Access

 (1)  
Location Zone 111 Radome


Procedure
 S 372-010
 (1)  
If a new nose radome will be installed, apply the erosion protection to the radome if it is necessary (Ref 53-52-01/701).

 S 492-011

 (2)  
Install the sling around the nose radome and attach the sling to the lift or crane (Fig. 202).
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 机身 FUSELAGE(49)