• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-29 14:33来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 A. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
AMM 73-25-34-000-040 Removal of the Engine Interface Unit (EIU)
 (1KS1,1KS2)
 AMM 73-25-34-400-040 Installation of the Engine Interface Unit (EIU)

 (1KS1,1KS2)
 AMM 73-25-34-710-043 Operational Test of the Engine Interface Unit
 ASM 73-25/08

 3. Fault Confirmation
__________________
 A. Do the operational test of the Engine Interface Unit (EIU) through the Centralized Fault Display System (CFDS) (Ref. AMM TASK 73-25-34-710-043).
 4. Fault Isolation
_______________
 A. If the test gives the maintenance message 115VU CRANK/MODE AUTO/IGN SEL SW:
 - replace the SEL SW-ENG/MODE/CRANK/AUTO IGN/IGN (6KS).
 (1) If the fault continues:

 - replace the EIU-2 (1KS2), (Ref. AMM TASK 73-25-34-000-040) and (Ref. AMM TASK 73-25-34-400-040).

 (2) If the fault continues:


 - do a check and repair the wiring from the EIU 2 (1KS1) to the switch (6KS) pins AA/1C, 1A, 1B to pins 2, 3, 4, (Ref. ASM 73-25/08).
 B. Do the test given in Para. 3.A.
 F 『 EEFF : ALL E ∞∞76-12-00∞∞∞∞∞∞∞∞∞∞Page 204
 E E Feb 01/98 E E ECES
E

 F 『
 E C F M E
 E E
 E 56 E
 E E


 TASK 76-12-00-810-810
 Failure of the Control of the Fuel Shut-off Valve on Engine 1
 1. Possible Causes
_______________
 - aircraft wiring

 - RELAY-ENG/MASTER 1 (11QG)

 - ACTUATOR-LP FUEL VALVE, ENG 1 (9QG)

 - VALVE-LP FUEL, ENG 1 (12QM)


 2. Job Set-up Information
______________________
 A. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
AMM 28-24-00-710-002 Operational Test of the ENG 1(2) LP Fuel Valve 12QM
 (13QM)
R  AMM 28-24-41-000-001 Removal of the LP Fuel Valve 12QM(13QM)
R  AMM 28-24-41-400-001 Installation of the LP Fuel Valve 12QM(13QM) AMM 28-24-51-000-001 Removal of the LP Fuel Valve Actuator AMM 28-24-51-400-001 Installation of the LP Fuel Valve Actuator AMM 71-00-00-710-003 Engine Automatic Start ASM 28-24/01 ASM 76-12/01
 3. Fault Confirmation
__________________
 A. Test
 (1) Not applicable, the fault is evident.
 4. Fault Isolation
_______________
 A. Table of the circuit breakers used in this procedure:
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU FUEL/LP VALVE/MOT1/ENG1 1QG A08 121VU FUEL/LP VALVE/MOT2/ENG1 3QG M25
 F 『 EEFF : ALL E ∞∞76-12-00∞∞∞∞∞∞∞∞∞∞Page 205
 E E Nov 01/00 E E ECES
E B. If the fault symptom is identified by the CFDS message MASTER LEVER, HMU:

 F  『
 E  C F M  E
 E  E
 E  56  E
 E  E


 - make sure that the LP fuel valve is open (Ref. AMM TASK 28-24-00-710-002).
 (1) If the valve is not open:
 - do a check of the aircraft wiring between the circuit breakers (1QG), (3QG) and the ENG 1 LP fuel valve actuator (9QG) pins AA/A, BB/A (Ref. ASM 76-12/01) and (Ref. ASM 28-24/01).
 (a) If there is no continuity:

 - repair the above wiring or/and replace the RELAY-ENG/MASTER 1 (11QG).

 (b) If there is continuity:

 - replace the ACTUATOR-LP FUEL VALVE, ENG 1 (9QG) (Ref. AMM TASK 28-24-51-000-001) and (Ref. AMM TASK 28-24-51-400-001).

 (c) If the fault continues:


 - replace the VALVE-LP FUEL, ENG 1 (12QM) (Ref. AMM TASK 28-24-41-000-001) and (Ref. AMM TASK 28-24-41-400-001).
 C. Test
 (1) Start the engine 1 by the engine automatic start procedure (Ref. AMM TASK 71-00-00-710-003).

 (2) Make sure that there is no ECAM and CFDS fault message shown.


 F 『 EEFF : ALL E ∞∞76-12-00∞∞∞∞∞∞∞∞∞∞Page 206
 E E Feb 01/98 E E ECES
E

 F 『
 E C F M E
 E E
 E 56 E
 E E


 TASK 76-12-00-810-811
 Failure of the Control of the Fuel Shut-off Valve on Engine 2
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320 Trouble Shooting Manual 排故手册 发动机控制(20)